Revision history of "New construction of the station HZS Milovice – ensuring the resilience of the station Milovice Fire Rescue Corps of the Central Bohemian Region with an emphasis on adaptation to climate change and new risks" (Q74381)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2221:22, 12 October 2024DG Regio talk contribs 54,076 bytes +7 Changed label, description and/or aliases in pt
  • curprev 21:2221:22, 12 October 2024DG Regio talk contribs 54,069 bytes 0 Set a claim value: summary (P836): A execução do projeto reforçará as infraestruturas e a preparação da região da Boémia Central para novos riscos devidos às alterações climáticas – o risco de seca. A saída do projeto é uma nova estação P1 endurecida na cidade de Milovice, ORP Lysá nad Labem. O objetivo do projeto é assegurar a preparação do território da ORP Lysá nad Labem e assegurar uma resiliência suficiente dos componentes da região da Boémia Central aos efeitos dos incidentes c...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:1715:17, 25 July 2022DG Regio talk contribs 50,885 bytes +29,755 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 14,376 bytes +1,399 Created claim: summary (P836): La mise en œuvre du projet renforcera l’infrastructure et la préparation du HZS de la région de Bohême centrale aux nouveaux risques dus au changement climatique — le risque de sécheresse. Le résultat du projet est une nouvelle station résiliente de type P1 à Milovice, ORP Lysá nad Labem. L’objectif du projet est d’assurer la préparation du territoire de l’ORP Lysá nad Labem et d’assurer une résilience suffisante des composantes du HZS de la rég...
  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 12,977 bytes +321 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0422:04, 23 October 2020DG Regio talk contribs 13,105 bytes +268 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0422:04, 23 October 2020DG Regio talk contribs 12,837 bytes −271 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0422:04, 23 October 2020DG Regio talk contribs 13,108 bytes +1,327 Created claim: summary (P836): The implementation of the project will strengthen the infrastructure and preparedness of the Central Bohemian Region for new risks due to climate change – the risk of drought. The output of the project is a new hardened P1 station in the town of Milovice, ORP Lysá nad Labem. The aim of the project is to ensure the preparedness of the territory of the ORP Lysá nad Labem and ensure sufficient resilience of components of the Central Bohemian Region...
  • curprev 22:0422:04, 23 October 2020DG Regio talk contribs 11,781 bytes −909 Removed claim: summary (P836): The implementation of the project will lead to a strengthening of the infrastructure and preparedness of the fleets of the Central Bohemia Region to new risks due to climate change — the risk of drought. The output of the project is a new P1 ‘P’ resistance station in the city of Milovice, ORP Lysa nad Labem. The aim of the project is to ensure the preparedness of the territory of ODA and to ensure the resilience of the components of the EIGs o...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1206:12, 27 February 2020DG Regio talk contribs 11,400 bytes +909 Created claim: summary (P836): The implementation of the project will lead to a strengthening of the infrastructure and preparedness of the fleets of the Central Bohemia Region to new risks due to climate change — the risk of drought. The output of the project is a new P1 ‘P’ resistance station in the city of Milovice, ORP Lysa nad Labem. The aim of the project is to ensure the preparedness of the territory of ODA and to ensure the resilience of the components of the EIGs of...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020