Revision history of "Equipment SDH JPO III village Podmokly fire equipment" (Q74273)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2221:22, 12 October 2024DG Regio talk contribs 52,398 bytes +5 Changed label, description and/or aliases in pt
  • curprev 21:2221:22, 12 October 2024DG Regio talk contribs 52,393 bytes +38 Set a claim value: summary (P836): Atividade principal do projeto – Aquisição de técnicas especializadas e de meios materiais para eliminar os efeitos da queda de neve e da formação maciça de gelo acima da média. É uma compra de um carro de transporte de acordo com a TS e cálculos de preços a partir de estudos de mercado. Atividade complementar do projeto – estudos de viabilidade, custos de documentação para o SPP e organização dos procedimentos de seleção e adjudicação de contratos...

22 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:0915:09, 25 July 2022DG Regio talk contribs 49,161 bytes +28,445 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 14,556 bytes +1,485 Created claim: summary (P836): Activité principale du projet — Acquisition d’équipements spécialisés et de moyens de propriété pour éliminer les conséquences des précipitations de neige supérieures à la moyenne et du gel massif. Il s’agit de l’acquisition d’une voiture de transport selon TS et le calcul des prix à partir d’études de marché. Activité secondaire du projet — études de faisabilité, coûts de documentation pour le vice-président et organisation des procédures de sé...
  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 13,071 bytes +145 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1022:10, 23 October 2020DG Regio talk contribs 13,375 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1022:10, 23 October 2020DG Regio talk contribs 13,263 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1022:10, 23 October 2020DG Regio talk contribs 13,378 bytes +1,357 Created claim: summary (P836): Main activity of the project – Acquisition of specialised techniques and material means for removing the effects of above average snowfall and massive icing. It is a purchase of a transport car according to TS and price calculations from market research. Ancillary project activity – feasibility studies, costs of documentation for the SPP and organisation of selection and procurement procedures and publicity. The target group is residents. The ri...
  • curprev 22:1022:10, 23 October 2020DG Regio talk contribs 12,021 bytes −905 Removed claim: summary (P836): Main activity of the project — Acquisition of specialised techniques and means of material for the removal of excessive snowfall and massive icing. This is the purchase of a transport car in accordance with the TS and the price calculation from the market survey. Ancillary activity of the project — feasibility study, cost of documentation for the PR and organisation of selection and award procedures and publicity. The target group is the popul...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:1320:13, 26 February 2020DG Regio talk contribs 11,652 bytes +905 Created claim: summary (P836): Main activity of the project — Acquisition of specialised techniques and means of material for the removal of excessive snowfall and massive icing. This is the purchase of a transport car in accordance with the TS and the price calculation from the market survey. Ancillary activity of the project — feasibility study, cost of documentation for the PR and organisation of selection and award procedures and publicity. The target group is the populat...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020