Revision history of "Equipment SDH JPO II of Zbiroh fire brigade" (Q74209)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4105:41, 13 October 2024DG Regio talk contribs 52,420 bytes 0 Changed label, description and/or aliases in pt
  • curprev 05:4105:41, 13 October 2024DG Regio talk contribs 52,420 bytes +28 Set a claim value: summary (P836): A principal atividade do projeto — é a aquisição de técnicas especializadas e de recursos materiais para a realização de atividades relacionadas com a seca extrema — CAS e a aquisição de tecnologia especializada e de meios materiais para eliminar os efeitos da queda de neve e da formação maciça de gelo acima da média — DA de acordo com as especificações técnicas aprovadas da região HZS. Atividade auxiliar do projeto – estudo de viabilidade, custos d...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:0515:05, 25 July 2022DG Regio talk contribs 49,718 bytes +28,851 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:2101:21, 29 November 2021DG Regio talk contribs 14,625 bytes +1,494 Created claim: summary (P836): L’activité principale du projet — est l’acquisition d’équipements et de moyens spécialisés pour la réalisation d’activités liées à l’extrême sécheresse — CAS et l’acquisition d’équipements et d’équipements spécialisés pour éliminer les conséquences des précipitations de neige supérieures à la moyenne et du gel massif — DA selon les spécifications techniques approuvées du HZS de la Région. Activité secondaire du projet — étude de faisabilité, coû...
  • curprev 01:2101:21, 29 November 2021DG Regio talk contribs 13,131 bytes +143 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3021:30, 23 October 2020DG Regio talk contribs 13,437 bytes +102 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3021:30, 23 October 2020DG Regio talk contribs 13,335 bytes −69 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3021:30, 23 October 2020DG Regio talk contribs 13,404 bytes +1,412 Created claim: summary (P836): The main activity of the project – is the acquisition of specialised techniques and material resources for the performance of activities related to extreme drought – CAS and acquisition of specialised technology and material means for removing the effects of above average snowfall and massive icing – DA according to the approved technical specification of the HZS Region. Ancillary activity of the project – feasibility study, costs of documentati...
  • curprev 21:3021:30, 23 October 2020DG Regio talk contribs 11,992 bytes −995 Removed claim: summary (P836): The main activity of the project — the acquisition of specialised technology and assets for the performance of activities linked to extreme drought — CAS and acquisition of a specialised technique and means of substance to be used to remove the consequences of excessive snowfall and massive icing — DA, as agreed in the technical specifications of an EIG of the region. Ancillary activity of the project -feasibility study, the cost of documentat...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0820:08, 26 February 2020DG Regio talk contribs 11,720 bytes +995 Created claim: summary (P836): The main activity of the project — the acquisition of specialised technology and assets for the performance of activities linked to extreme drought — CAS and acquisition of a specialised technique and means of substance to be used to remove the consequences of excessive snowfall and massive icing — DA, as agreed in the technical specifications of an EIG of the region. Ancillary activity of the project -feasibility study, the cost of documentatio...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020