Revision history of "5.1a Reducing the energy performance of the buildings of the Commercial Academy in Cologne" (Q74024)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2121:21, 12 October 2024DG Regio talk contribs 49,016 bytes −9 Set a claim value: summary (P836): Como parte do projeto, as paredes do perímetro do edifício da escola serão isoladas, os telhados planos são isolados (um novo pára-raios é projetado), a troca de antigas janelas de madeira e as portas de entrada do edifício. A remediação do perímetro alvenaria em relação à ocorrência de humidade será tratada no edifício dos camarins.A realização do projeto deverá poupar o consumo energético anual total de 502,3 GJ/ano, o que corresponde a 139,5 MWh/...

23 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 14:5114:51, 25 July 2022DG Regio talk contribs 46,296 bytes +26,866 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1401:14, 29 November 2021DG Regio talk contribs 13,495 bytes +1,364 Created claim: summary (P836): Le projet permettra d’isoler thermiquement les murs du périmètre du bâtiment scolaire, d’isoler les toits plats (de nouveaux paratonnerres sont conçus), de remplacer les vieilles fenêtres en bois et de doubles d’entrée de la cour du bâtiment. Dans la construction du vestiaire sera résolu la remise en état de la maçonnerie du périmètre en relation avec l’apparition de l’humidité.La réalisation du projet devrait permettre d’économiser la consommat...
  • curprev 01:1401:14, 29 November 2021DG Regio talk contribs 12,131 bytes +162 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 12,418 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 12,269 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 12,413 bytes +1,322 Created claim: summary (P836): As part of the project, the perimeter walls of the school building will be insulated, the flat roofs are insulated (a new lightning rod is designed), the exchange of old wooden windows and the entrance doors of the building. Remediation of the perimeter masonry in connection with the occurrence of humidity will be dealt with in the building of the dressing rooms.Realisation of the project is expected to save the total annual energy consumption o...
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 11,091 bytes −969 Removed claim: summary (P836): The project will lead to the insulation of the peripheral wall of the school’s premises, the insulation of flat roofs (the roof in question being designed for a new lightning conductor), the replacement of the old wooden windows and the footsteps of the building. The cloakroom will be dealt with by remediating the circumferential zdiva in the context of occurrences damp. the project is expected to save the total annual energy consumption of 50...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 10,779 bytes +969 Created claim: summary (P836): The project will lead to the insulation of the peripheral wall of the school’s premises, the insulation of flat roofs (the roof in question being designed for a new lightning conductor), the replacement of the old wooden windows and the footsteps of the building. The cloakroom will be dealt with by remediating the circumferential zdiva in the context of occurrences damp. the project is expected to save the total annual energy consumption of 502,...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020