Revision history of "Reduction of energy intensity – The Municipality of Saint Marí" (Q73880)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2021:20, 12 October 2024DG Regio talk contribs 50,975 bytes +3 Changed label, description and/or aliases in pt
  • curprev 21:2021:20, 12 October 2024DG Regio talk contribs 50,972 bytes +6 Set a claim value: summary (P836): O projecto inclui obras de construção, nomeadamente o isolamento de toda a envolvente do edifício, o novo sistema UV com bomba de calor e ventilação com recuperação. O projeto proposto conduzirá a uma redução do desempenho energético do edifício público do gabinete municipal no município de Svatá Maří, com uma população de 583. O edifício não é objeto de arrendamento e não é utilizado para fins comerciais, serve como instalações administrativas da C...

22 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 14:4014:40, 25 July 2022DG Regio talk contribs 48,789 bytes +28,921 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1601:16, 29 November 2021DG Regio talk contribs 13,617 bytes +1,461 Created claim: summary (P836): Le projet comprend des travaux de construction, à savoir l’isolation de toute l’enveloppe du bâtiment, un nouveau système du CC avec pompe à chaleur et ventilation avec récupération. La proposition entraînera une réduction de la performance énergétique du bâtiment public du bureau municipal de la municipalité de St. Maří, avec une population de 583. Le bâtiment n’est pas locatif et n’est pas utilisé à des fins commerciales, il sert de cadre admi...
  • curprev 01:1601:16, 29 November 2021DG Regio talk contribs 12,156 bytes +140 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3221:32, 23 October 2020DG Regio talk contribs 12,465 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3221:32, 23 October 2020DG Regio talk contribs 12,341 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3221:32, 23 October 2020DG Regio talk contribs 12,473 bytes +1,430 Created claim: summary (P836): The project includes construction works, namely the insulation of the whole envelope of the building, the new UV system with heat pump and ventilation with recuperation. The proposed project will lead to reduced energy performance of the public building of the municipal office in the municipality of Svatá Maří with a population of 583. The building is not the subject of lease and is not used for business, it serves as administrative facilities o...
  • curprev 21:3221:32, 23 October 2020DG Regio talk contribs 11,043 bytes −974 Removed claim: summary (P836): The project involves construction works, namely the insulation of the entire building envelope, the new discharge system with a heat pump and recovery with recovery. They will lead to a reduced energy demand for the public building of the municipal office in the municipality of St. Petersburg with a population of 583 inhabitants. The building is not rented and is not used for business purposes, serves as an administrative back-up for the gener...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0720:07, 26 February 2020DG Regio talk contribs 10,737 bytes +974 Created claim: summary (P836): The project involves construction works, namely the insulation of the entire building envelope, the new discharge system with a heat pump and recovery with recovery. They will lead to a reduced energy demand for the public building of the municipal office in the municipality of St. Petersburg with a population of 583 inhabitants. The building is not rented and is not used for business purposes, serves as an administrative back-up for the general...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020