Revision history of "Reduction of energy intensity of object No.78 Bukovice – Municipal Office and Firearms" (Q73814)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:3805:38, 13 October 2024DG Regio talk contribs 50,543 bytes −2 Changed label, description and/or aliases in pt
  • curprev 05:3805:38, 13 October 2024DG Regio talk contribs 50,545 bytes −13 Set a claim value: summary (P836): O objetivo do projeto é implementar medidas técnicas de construção complexas destinadas a reduzir o desempenho energético do edifício público n.o 78 (Gabinete Geral e Fire Armory) no município de Bukovice. As medidas consistem em isolar a envolvente do edifício, incluindo a substituição dos enchimentos de abertura (janelas e portas, incluindo portas de secção no arsenal de incêndio) e o isolamento do telhado. O projeto beneficiará da redução do cons...

12 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 14:3514:35, 25 July 2022DG Regio talk contribs 48,353 bytes +28,574 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 13,520 bytes +1,417 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de mesures structurelles et techniques complexes visant à améliorer la performance énergétique du bâtiment public no 78 (bureau général et armes de feu) de la municipalité de Bukovice. Les mesures consistent à isoler l’enveloppe du bâtiment, y compris le remplacement des ouvertures (fenêtres et portes, y compris les portes sectionnelles dans la caserne de pompiers) et l’isolation du toit. Les avantages de...
  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 12,103 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3121:31, 23 October 2020DG Regio talk contribs 12,389 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3121:31, 23 October 2020DG Regio talk contribs 12,242 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3121:31, 23 October 2020DG Regio talk contribs 12,396 bytes +1,327 Created claim: summary (P836): The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy...
  • curprev 21:3121:31, 23 October 2020DG Regio talk contribs 11,069 bytes −893 Removed claim: summary (P836): The purpose of the project is to implement complex technical measures aimed at reducing the energy performance of public building No 78 (General office and fire arms) in the municipality of Bukovice. The measures consist of insulation of the envelope of the building, including the filling of openings (windows and doors including fire fighting in fire armouries) and hot roof insulation. The implementation of the project will benefit the reducti...

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0720:07, 26 February 2020DG Regio talk contribs 10,671 bytes +893 Created claim: summary (P836): The purpose of the project is to implement complex technical measures aimed at reducing the energy performance of public building No 78 (General office and fire arms) in the municipality of Bukovice. The measures consist of insulation of the envelope of the building, including the filling of openings (windows and doors including fire fighting in fire armouries) and hot roof insulation. The implementation of the project will benefit the reduction...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020