Revision history of "Insulation of the envelope of the building MSŠ Letovice, reconstruction of heat source including heating system" (Q73784)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 14:3314:33, 25 July 2022DG Regio talk contribs 42,329 bytes +24,303 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 12,810 bytes +1,133 Created claim: summary (P836): L’objectif du projet est de réduire la performance énergétique du bâtiment et du système énergétique exploité (production de chaleur et électricité) et d’augmenter la part de la production de chaleur provenant des SER. Le bâtiment se trouve sur les parcelles 1296/1, 1296/5, 1296/3, 1296/4, no 500., translated_summary
  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 11,677 bytes +189 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3921:39, 23 October 2020DG Regio talk contribs 11,937 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3921:39, 23 October 2020DG Regio talk contribs 11,765 bytes −185 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3921:39, 23 October 2020DG Regio talk contribs 11,950 bytes +1,085 Created claim: summary (P836): The aim of the project is to reduce the energy performance of the building and the energy systems operated (heat and electricity production) and increase the share of heat production from renewables. The object is on parcels 1296/1, 1296/5, 1296/3, 1296/4, no. 500., translated_summary
  • curprev 21:3921:39, 23 October 2020DG Regio talk contribs 10,865 bytes −635 Removed claim: summary (P836): The objective of the project is to reduce the energy performance of the building and the energy system operated (production of heat and energy) and to increase the share of production of heat from RES. An object is on cells 1296/1, 1296/5, 1296/3, 1296/4, No 500., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0620:06, 26 February 2020DG Regio talk contribs 10,218 bytes +635 Created claim: summary (P836): The objective of the project is to reduce the energy performance of the building and the energy system operated (production of heat and energy) and to increase the share of production of heat from RES. An object is on cells 1296/1, 1296/5, 1296/3, 1296/4, No 500., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020