Revision history of "5.1a Insulation of kindergarten Ezdkovice – II. stage" (Q73650)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0715:07, 13 October 2024DG Regio talk contribs 52,417 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:0715:07, 13 October 2024DG Regio talk contribs 52,414 bytes −5 Set a claim value: summary (P836): Haverá uma substituição da adega. janelas, ampliado 3 stand. janelas. aberturas e demolido 1 novas janelas nas salas recém-concebidas, no SV. parte do solo será removido. chão para a escotilha e 2 stands. janelas no escudo. parede, que será substituído por novas janelas. O novo piso no espaço do sótão será isolado por pisos. EPS 100S, em todos os quartos recém-estabelecidos em SV parte de 1.NP. A fachada da parte não integrada do objeto, incluindo o...

20 March 2024

15 January 2024

22 December 2023

12 June 2023

1 June 2023

17 February 2023

25 July 2022

  • curprev 14:2414:24, 25 July 2022DG Regio talk contribs 48,718 bytes +28,244 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 14,112 bytes +1,529 Created claim: summary (P836): Il y aura un remplacement de la cave. fenêtres, grossissement de 3 stalles. fenêtres. ouvertures et démolition d’une nouvelle fenêtre dans les pièces nouvellement conçues, dans la partie SV du sol sera enlevée stalle. plancher jusqu’au couvercle et démoli 2 stalles. fenêtres dans le mur de bouclier, kt. seront remplacés par de nouvelles fenêtres. Le nouvel étage de l’espace grenier sera isolé. EPS 100S, dans toutes les chambres nouvellement créé...
  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 12,583 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:0421:04, 23 October 2020DG Regio talk contribs 12,918 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:0421:04, 23 October 2020DG Regio talk contribs 12,804 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:0421:04, 23 October 2020DG Regio talk contribs 12,916 bytes +1,419 Created claim: summary (P836): There will be a replacement of the cellar. windows, enlarged 3 stand. windows. openings and demolished 1 new windows in the newly designed rooms, in the SV. part of the soil will be removed. floor to the hatch and 2 stands. windows in the shield. wall, which will be replaced by new windows. The new floor in the attic space will be insulated by floors. EPS 100S, in all newly established. rooms in SV part of 1.NP. The facade of the non-integrated...
  • curprev 21:0421:04, 23 October 2020DG Regio talk contribs 11,497 bytes −1,013 Removed claim: summary (P836): The cellars will be replaced by windows, the extension of the 3 entrance to the holes and the cutting of 1 new. windows in the new design. in the area of the enclosure, the current floor will be removed until the capts. the walls of the 2 windows will be removed, and the wall, kt, will be replaced with windows with new windows. A new floor in the soil and the floor will be a teaser floor. EPS 100S, in all newly establised settings, in the SV p...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1506:15, 27 February 2020DG Regio talk contribs 11,241 bytes +1,013 Created claim: summary (P836): The cellars will be replaced by windows, the extension of the 3 entrance to the holes and the cutting of 1 new. windows in the new design. in the area of the enclosure, the current floor will be removed until the capts. the walls of the 2 windows will be removed, and the wall, kt, will be replaced with windows with new windows. A new floor in the soil and the floor will be a teaser floor. EPS 100S, in all newly establised settings, in the SV par...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020