Revision history of "Energy savings of kindergartens and practical schools Jevíčko" (Q73587)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0715:07, 13 October 2024DG Regio talk contribs 46,432 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:0715:07, 13 October 2024DG Regio talk contribs 46,431 bytes −7 Set a claim value: summary (P836): Isolamento do invólucro exterior do edifício, isolamento do telhado, substituição de enchimentos de orifícios, instalação de ar condicionado com recuperação e sala de caldeiras com sistema de aquecimento, que será regulado. A execução terá lugar na p. 1131/1, p. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, n.o 586 Jevíčko

23 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 14:2014:20, 25 July 2022DG Regio talk contribs 42,737 bytes +24,136 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 14,288 bytes +1,204 Created claim: summary (P836): L’isolation de l’enveloppe du bâtiment, l’isolation du toit, le remplacement des trous de remplissage, l’installation de la climatisation avec récupération et la chaufferie avec système de chauffage qui sera régulé seront mis en œuvre. La mise en œuvre aura lieu à C.N. 1131/1, p. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko — banlieue, No 586 Jevíčko, translated_summary
  • curprev 01:1501:15, 29 November 2021DG Regio talk contribs 13,084 bytes +141 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:2221:22, 23 October 2020DG Regio talk contribs 13,396 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2221:22, 23 October 2020DG Regio talk contribs 13,274 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2221:22, 23 October 2020DG Regio talk contribs 13,412 bytes +1,170 Created claim: summary (P836): Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko, translated_summary
  • curprev 21:2221:22, 23 October 2020DG Regio talk contribs 12,242 bytes −763 Removed claim: summary (P836): The insulation of the building envelope, the insulation of the roof, the replacement of the roof filling, the installation of energy recovery/recovery and the boiler room with the heating system that will be cleared will be carried out. The implementation will be carried out on OJ 1131/1, 538/1, 538/20, 538/25, 538/57, 538/60, cadastral district. Jevíčko — Letters, No 586 of the Jelid, remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0520:05, 26 February 2020DG Regio talk contribs 11,306 bytes +763 Created claim: summary (P836): The insulation of the building envelope, the insulation of the roof, the replacement of the roof filling, the installation of energy recovery/recovery and the boiler room with the heating system that will be cleared will be carried out. The implementation will be carried out on OJ 1131/1, 538/1, 538/20, 538/25, 538/57, 538/60, cadastral district. Jevíčko — Letters, No 586 of the Jelid, Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020