Revision history of "Reduction of energy performance of the Husova 788 building, Chodov" (Q73433)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 45,256 bytes +14 Set a claim value: summary (P836): O projeto apresentado tem por objeto a construção da antiga cantina escolar e do séquito em Husova 788, 357 35 Chodov. De acordo com a documentação do projeto e a avaliação energética, graças ao projeto, a alvenaria do perímetro, o telhado do edifício e os preenchimentos de orifícios serão isolados.

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 14:0814:08, 25 July 2022DG Regio talk contribs 41,540 bytes +23,271 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 13,234 bytes +1,149 Created claim: summary (P836): Le sujet du projet présenté est la construction de l’ancienne cantine scolaire et après-école à Husova 788, 357 35 Chodov. Conformément à la documentation du projet et à l’évaluation de l’énergie, le projet isolera la maçonnerie du périmètre, le toit du bâtiment et le remplacement des remplissages de trous., translated_summary
  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 12,085 bytes +136 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:1121:11, 23 October 2020DG Regio talk contribs 12,398 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1121:11, 23 October 2020DG Regio talk contribs 12,273 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1121:11, 23 October 2020DG Regio talk contribs 12,383 bytes +1,123 Created claim: summary (P836): The subject of the submitted project is the building of the former school canteen and retinue at Husova 788, 357 35 Chodov. In accordance with the project documentation and energy assessment, thanks to the project, the perimeter masonry, the roof of the building and the hole fillings will be insulated., translated_summary
  • curprev 21:1121:11, 23 October 2020DG Regio talk contribs 11,260 bytes −677 Removed claim: summary (P836): The subject of the present project is the former school canteen and the satellites at Husova 788, 357 35 Chodov. In accordance with the project documentation and the energy report, the project results in the insulation of the circuit masonry, the roof of the building and the replacement of the selector., remove_old_english_translation

24 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0520:05, 26 February 2020DG Regio talk contribs 10,655 bytes +677 Created claim: summary (P836): The subject of the present project is the former school canteen and the satellites at Husova 788, 357 35 Chodov. In accordance with the project documentation and the energy report, the project results in the insulation of the circuit masonry, the roof of the building and the replacement of the selector., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020