Revision history of "Reducing the energy performance of the building of Nechanice Primary School – II" (Q73378)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 52,649 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 52,649 bytes −19 Set a claim value: summary (P836): No âmbito do projeto, a cobertura do edifício técnico do edifício será isolada e o aquecimento do edifício da escola primária será alterado. Atualmente, o edifício é aquecido por fogões de armazenamento e aquecedores. Estes recursos serão trocados por 3 caldeiras de condensação a gás, incluindo a construção de um novo sistema de aquecimento. O edifício está localizado na zona paralisada nem.kult.pam.,pam. zone, reservations, nm.nar.cult.culture monu...

23 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 14:0414:04, 25 July 2022DG Regio talk contribs 48,966 bytes +28,585 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 14,125 bytes +1,449 Created claim: summary (P836): Dans le cadre du projet, le revêtement du toit du bâtiment technique sera isolé et le chauffage dans le bâtiment de l’école primaire sera modifié. Actuellement, l’objet est chauffé par des poêles à accumulation et des chauffages directs. Ces ressources seront échangées contre 3 chaudières à condensation de gaz, y compris la construction d’un nouveau système de chauffage. Le bâtiment est situé dans la zone para. nem.kult.pam., zone pam, réserve,...
  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 12,676 bytes +150 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,975 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,834 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,978 bytes +1,408 Created claim: summary (P836): As part of the project, the roof covering of the building’s technical building will be insulated and the heating in the elementary school building will be changed. At present, the building is heated by storage stoves and heaters. These resources will be exchanged for 3 gas condensing boilers, including the construction of a new heating system. The building is located in the paralysed zone nem.kult.pam.,pam. zone, reservations, nm.nar.cult.cultur...
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 11,570 bytes −916 Removed claim: summary (P836): The project will lead to the insulation of the roof envelope of the building and to the heating change of the Primary School. An object is being heated and a storage centre. These resources will be exchanged under the project for 3 gas condensing boilers including the construction of a new heating system. The building is located on a site with a site of the power station, arm, park, reservation and office area. the monuments are located on par...

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0420:04, 26 February 2020DG Regio talk contribs 11,195 bytes +916 Created claim: summary (P836): The project will lead to the insulation of the roof envelope of the building and to the heating change of the Primary School. An object is being heated and a storage centre. These resources will be exchanged under the project for 3 gas condensing boilers including the construction of a new heating system. The building is located on a site with a site of the power station, arm, park, reservation and office area. the monuments are located on parce...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020