Revision history of "5.1b Reducing the energy performance of the building – Secondary School Netolice" (Q73370)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 50,430 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 50,429 bytes −9 Set a claim value: summary (P836): Como parte do projeto, a ventilação forçada será instalada com recuperação. O equipamento de ventilação com recuperação de calor garante parâmetros consistentemente satisfatórios do ambiente interior nas salas de aula e sala de música e conduzirá a uma redução das perdas térmicas por ventilação, ou seja, à redução global do desempenho energético do edifício. Este é um projeto abrangente para reduzir o desempenho energético do edifício combinado em d...

20 March 2024

15 January 2024

22 December 2023

12 June 2023

1 June 2023

17 February 2023

25 July 2022

  • curprev 14:0314:03, 25 July 2022DG Regio talk contribs 46,736 bytes +27,080 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 13,831 bytes +1,393 Created claim: summary (P836): Le projet installera une ventilation forcée avec récupération. Les équipements de climatisation avec récupération de chaleur garantiront que les paramètres de l’environnement intérieur dans les salles de classe et les salles de musique sont satisfaisants en permanence et entraîneront une réduction des pertes de chaleur par la ventilation, c’est-à-dire une amélioration globale de la performance énergétique du bâtiment. Il s’agit d’un projet compl...
  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 12,438 bytes +140 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,747 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,606 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,743 bytes +1,287 Created claim: summary (P836): As part of the project, forced ventilation will be installed with recuperation. Ventilation equipment with heat recovery ensures consistently satisfactory parameters of the indoor environment in classrooms and music hall and will lead to a reduction of thermal losses by ventilation, i.e. to the overall reduction of the energy performance of the building. This is a comprehensive project to reduce the energy performance of the building combined in...
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 11,456 bytes −831 Removed claim: summary (P836): As part of the project, a forced ventilation system will be installed with recovery. A hot return device shall ensure permanently satisfactory parameters of the internal environment in the classroom and in the musical room and lead to a reduction in heat loss by ventilation, i.e. to the overall reduction of the energy performance of the building. This is a comprehensive project to reduce the energy performance of the building combined in two a...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0420:04, 26 February 2020DG Regio talk contribs 11,015 bytes +831 Created claim: summary (P836): As part of the project, a forced ventilation system will be installed with recovery. A hot return device shall ensure permanently satisfactory parameters of the internal environment in the classroom and in the musical room and lead to a reduction in heat loss by ventilation, i.e. to the overall reduction of the energy performance of the building. This is a comprehensive project to reduce the energy performance of the building combined in two app...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020