Revision history of "Energy Savings of the Sulická Building 1304/46" (Q73321)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:3605:36, 13 October 2024DG Regio talk contribs 46,859 bytes +2 Changed label, description and/or aliases in pt
  • curprev 05:3605:36, 13 October 2024DG Regio talk contribs 46,857 bytes +2 Set a claim value: summary (P836): As modificações de construção incluem o isolamento do invólucro exterior do edifício administrativo da estação de bombagem de água, a fim de melhorar as propriedades térmicas, técnicas e energéticas do edifício. Este é o isolamento das fachadas do objeto por um sistema de isolamento de contacto (KZS) e a substituição dos enchimentos. Parte das modificações é o isolamento do telhado do edifício existente, incluindo a instalação de uma bomba de calor,...

23 March 2024

15 January 2024

19 June 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 13:5913:59, 25 July 2022DG Regio talk contribs 45,198 bytes +26,111 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:0701:07, 29 November 2021DG Regio talk contribs 14,156 bytes +1,391 Created claim: summary (P836): Les travaux de construction comprennent l’isolation de l’enveloppe du bâtiment administratif de la station de pompage de l’eau en raison de l’amélioration des propriétés thermiques techniques et énergétiques du bâtiment. Il s’agit de l’isolation des façades du bâtiment par le système d’isolation de contact (KZS) et le remplacement du remplissage des ouvertures. Une partie des modifications est également l’isolation du toit du bâtiment existant,...
  • curprev 01:0701:07, 29 November 2021DG Regio talk contribs 12,765 bytes +112 Changed label, description and/or aliases in fr: translated_label

28 December 2020

29 October 2020

23 October 2020

  • curprev 20:5420:54, 23 October 2020DG Regio talk contribs 13,102 bytes +106 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5420:54, 23 October 2020DG Regio talk contribs 12,996 bytes −93 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5420:54, 23 October 2020DG Regio talk contribs 13,089 bytes +1,310 Created claim: summary (P836): Construction modifications include insulation of the outer shell of the administrative building of the water pumping station in order to improve the thermally technical and energy properties of the building. This is the insulation of the facades of the object by a contact insulation system (KZS) and the replacement of the fillers. Part of the modifications is the roof insulation of the existing building including the installation of a heat pump,...
  • curprev 20:5420:54, 23 October 2020DG Regio talk contribs 11,779 bytes −857 Removed claim: summary (P836): The construction work includes the insulation of the building envelope of the administrative building of the water pump station due to the improvement of the thermal and energy properties of the building. This is a insulation of the facades of the object by the contact warm system (KZS) and the exchange of the holes is filled. The modifications include the insulation of the roof of the existing building, including the installation of a heat pu...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0320:03, 26 February 2020DG Regio talk contribs 10,952 bytes +857 Created claim: summary (P836): The construction work includes the insulation of the building envelope of the administrative building of the water pump station due to the improvement of the thermal and energy properties of the building. This is a insulation of the facades of the object by the contact warm system (KZS) and the exchange of the holes is filled. The modifications include the insulation of the roof of the existing building, including the installation of a heat pump...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020