Revision history of "Thermal insulation of the municipal office no. 40 in the village of Pletený Újezd including the replacement of windows and roofs" (Q73200)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

13 October 2024

  • curprev 05:3005:30, 13 October 2024DG Regio talk contribs 53,871 bytes −5 Changed label, description and/or aliases in pt
  • curprev 05:3005:30, 13 October 2024DG Regio talk contribs 53,876 bytes −19 Set a claim value: summary (P836): Isolamento das paredes do perímetro do edifício através de um sistema de isolamento de contacto.Integração do pedestal com placas de pedestal abaixo do nível do piso adjacente do piso térreo.Telhado isolado com fibras minerais no teto e entre vigas. Isolamento térmico do pavimento com placas PUR e painéis de aquecimento do pavimento. Trocar as janelas originais por novas. Trocar a porta da frente por uma nova. Troca de fonte de calor para aqueciment...

20 March 2024

15 January 2024

22 December 2023

6 July 2023

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:4913:49, 25 July 2022DG Regio talk contribs 50,193 bytes +29,270 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 16,090 bytes +1,519 Created claim: summary (P836): Isolation des murs extérieurs du bâtiment par système d’isolation de contact.Tinning du socle par des plaques de plinthe sous le niveau du plancher adjacent du rez-de-chaussée.Fermeture du toit avec des fibres minérales dans le plafond suspendu et entre chevrons. Isolant le sol au sol avec des panneaux PUR et des panneaux de système de chauffage par le sol. Remplacement des fenêtres d’origine pour de nouvelles fenêtres. Remplacement de la porte...
  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 14,571 bytes +197 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:1021:10, 23 October 2020DG Regio talk contribs 14,831 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1021:10, 23 October 2020DG Regio talk contribs 14,641 bytes −188 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1021:10, 23 October 2020DG Regio talk contribs 14,829 bytes +1,394 Created claim: summary (P836): Insulation of the perimeter walls of the building through a contact insulation system.Integration of the plinth with plinth boards below the level of the adjacent floor of the ground floor.Insulated roof with mineral fibers in the ceiling and between rafters. Thermal insulation of the floor with PUR boards and floor heating system panels. Exchanging the original windows for new ones. Changing the front door for a new one. Exchange of heat source...
  • curprev 21:1021:10, 23 October 2020DG Regio talk contribs 13,435 bytes −886 Removed claim: summary (P836): Insulation of the building wall with the contact warm system. insulation of sokal boards below the adjacent floor level. insulation of the roof with the mineral fibre in the light and between the croflower. Insulation of floor space boards via PUR and ground floor heating boards. Replacement of original windows for new ones. Exchange of entry doors for new ones. The exchange of a heat source for heating and hot water on a condensing gas boiler...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0920:09, 26 February 2020DG Regio talk contribs 12,235 bytes +886 Created claim: summary (P836): Insulation of the building wall with the contact warm system. insulation of sokal boards below the adjacent floor level. insulation of the roof with the mineral fibre in the light and between the croflower. Insulation of floor space boards via PUR and ground floor heating boards. Replacement of original windows for new ones. Exchange of entry doors for new ones. The exchange of a heat source for heating and hot water on a condensing gas boiler w...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)