Revision history of "Reduction of energy performance of the object COH Klatovy – building modifications of the building no. 782/III" (Q73015)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 14:4414:44, 13 October 2024DG Regio talk contribs 50,823 bytes −19 Changed label, description and/or aliases in pt
  • curprev 14:4414:44, 13 October 2024DG Regio talk contribs 50,842 bytes −121 Set a claim value: summary (P836): O projeto trata da reconstrução global do edifício administrativo localizado na p. n.o 3643 em k.ú. Klatovy/III. Como parte da reconstrução, o invólucro circunferencial leve existente será desmontado, que será substituído por um invólucro murado com um sistema de aquecimento por contato. O objeto será aquecido por uma caldeira de condensação a gás, um novo sistema de aquecimento será realizado.

20 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:2713:27, 25 July 2022DG Regio talk contribs 48,291 bytes +27,774 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 14,468 bytes +1,370 Created claim: summary (P836): Le projet porte sur la reconstruction globale du bâtiment administratif situé à la p. 3643 à la k.ú. Klatovy/III.Dans le cadre de la reconstruction, l’enveloppe lumineuse existante sera démontée, qui sera remplacée par un revêtement mural avec système d’étanchéité de contact. Tous les éléments d’ouverture extérieure seront remplacés, l’isolation du sol du 1er étage et le toit du bâtiment seront isolés. L’objet sera chauffé par une chaudière à co...
  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 13,098 bytes +169 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:4520:45, 23 October 2020DG Regio talk contribs 13,378 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:4520:45, 23 October 2020DG Regio talk contribs 13,206 bytes −167 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:4520:45, 23 October 2020DG Regio talk contribs 13,373 bytes +1,319 Created claim: summary (P836): The project deals with the overall reconstruction of the administrative building located on p. no. 3643 in k.ú. Klatovy/III.As part of the reconstruction, the existing light circumferential shell will be dismantled, which will be replaced by a walled casing with a contact heating system.All outer opening elements will be replaced, insulated floor 1st floor and roofing of the building will be replaced. The object will be heated by a gas condensin...
  • curprev 20:4520:45, 23 October 2020DG Regio talk contribs 12,054 bytes −872 Removed claim: summary (P836): The project deals with the total renovation of the administrative building located on p. 3643 in the cadastral district. The Klatovy/III.V reconstruction phase will be the dismantling of the current light envelope, which will be replaced by a lining with the focal point of the focal point. all external wheel elements have been replaced, with the floor of the 1.NP and the roof of the building being replaced. The object will be heated by a gas c...

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0020:00, 26 February 2020DG Regio talk contribs 11,635 bytes +872 Created claim: summary (P836): The project deals with the total renovation of the administrative building located on p. 3643 in the cadastral district. The Klatovy/III.V reconstruction phase will be the dismantling of the current light envelope, which will be replaced by a lining with the focal point of the focal point. all external wheel elements have been replaced, with the floor of the 1.NP and the roof of the building being replaced. The object will be heated by a gas con...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020