Revision history of "INSULATION OF THE CIRCUMFERENTIAL CASING OF THE SOKOLOVNA OBJECT" (Q72939)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 50,619 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 50,621 bytes −5 Set a claim value: summary (P836): O objetivo do projeto é reduzir o desempenho energético do edifício Sokolovna e reduzir os custos operacionais. O projeto resolve o isolamento do perímetro do edifício através de um sistema de isolamento por contacto certificado. Além disso, as janelas e portas de madeira não conformes serão substituídas por plástico com vidros duplos isolantes. Como parte do projeto, o isolamento do solo e o isolamento do piso em instalações sanitárias serão realiz...

20 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:1913:19, 25 July 2022DG Regio talk contribs 46,924 bytes +27,201 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,888 bytes +1,393 Created claim: summary (P836): L’objectif du projet est d’améliorer la performance énergétique du bâtiment en faucon et de réduire les coûts d’exploitation. Le projet résout l’isolation de l’enveloppe du bâtiment avec un système d’isolation de contact certifié. En outre, les fenêtres et les portes en bois non conformes seront remplacées par du plastique avec un verre isolant double vitrage. Dans le cadre du projet, l’isolation du sol et l’isolation du sol seront réalisées dan...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 12,495 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,819 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,696 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,798 bytes +1,345 Created claim: summary (P836): The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In o...
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 11,453 bytes −906 Removed claim: summary (P836): The project aims at reducing the energy performance of the sonar building and reducing the operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will include the insulation of soil and the insulation of floors in social faciliti...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0120:01, 26 February 2020DG Regio talk contribs 11,087 bytes +906 Created claim: summary (P836): The project aims at reducing the energy performance of the sonar building and reducing the operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will include the insulation of soil and the insulation of floors in social facilities...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020