Revision history of "INSULATION OF THE DISTRICT CASING OF THE MUNICIPAL OFFICE BUILDING" (Q72931)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 49,968 bytes −10 Changed label, description and/or aliases in pt
  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 49,978 bytes +1 Set a claim value: summary (P836): O objetivo do projeto é reduzir o desempenho energético do edifício de escritórios municipal e reduzir os custos operacionais. O projeto resolve o isolamento do perímetro do edifício através de um sistema de isolamento por contacto certificado. Além disso, as janelas e portas de madeira não conformes serão substituídas por plástico com vidros duplos isolantes. O projecto incluirá também o isolamento do solo em lã mineral. Para isso, haverá um gestor...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:1713:17, 25 July 2022DG Regio talk contribs 46,275 bytes +26,623 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,812 bytes +1,383 Created claim: summary (P836): L’objectif du projet est d’améliorer la performance énergétique du bâtiment du bureau municipal et de réduire les coûts d’exploitation. Le projet résout l’isolation de l’enveloppe du bâtiment avec un système d’isolation de contact certifié. En outre, les fenêtres et les portes en bois non conformes seront remplacées par du plastique avec un verre isolant double vitrage. Dans le cadre du projet, l’isolation du sol en laine minérale sera également...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 12,429 bytes +126 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,752 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,627 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,745 bytes +1,290 Created claim: summary (P836): The aim of the project is to reduce the energy performance of the municipal office building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. The project will also include mineral wool insulation of soil. In order to achieve this, there will be...
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 11,455 bytes −873 Removed claim: summary (P836): The project aims at reducing the energy performance of the municipality’s building and reducing operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will also cover the insulation of the soil with mineral tolerance. To achieve...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0120:01, 26 February 2020DG Regio talk contribs 11,056 bytes +873 Created claim: summary (P836): The project aims at reducing the energy performance of the municipality’s building and reducing operating costs. The project shall address the insulation of the building envelope of the certified building system. In addition, the replacement of non-compliant wooden windows and doors in the case of plastic with insulation double glass will be carried out. The project will also cover the insulation of the soil with mineral tolerance. To achieve th...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020