Revision history of "Thermal insulation of the OÚ and kindergarten in the village Rybnice" (Q72928)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 50,521 bytes −1 Set a claim value: summary (P836): Isolamento térmico das paredes dos circuitos com EPS 100F tl. 160 mmParte isolada do solo por meio de lã mineral Isolamento da parte ambulante do solo com lã mineral Isolamento do tecto por cima do anexo por pulverização Isolamento das paredes do solo não aquecido por 140 mm EPS 100FInsulação do tecto por cima da escada utilizando pasta (ouate) mineral de 240 mmInstalação de sistema de ventilação forçada com recuperação Regulação do sistema de aquec...

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:1713:17, 25 July 2022DG Regio talk contribs 46,820 bytes +26,976 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,916 bytes +1,418 Created claim: summary (P836): Isolation thermique des parois périphériques à l’aide d’EPS 100F tl. 160 mmInstallation Partie non peinte du sol à l’aide de laine minérale Isolation de la partie courante du sol à l’aide de laine minérale Isolation du plafond au-dessus de l’extension par isolation pulvérisée Isolation murale au sol non chauffé à l’aide d’un toit de 140 mm EPS 100FS au-dessus de l’escalier en laine minérale de 240 mmInstallation d’un système de ventilation forcé...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 12,498 bytes +144 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,803 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,675 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,808 bytes +1,323 Created claim: summary (P836): Thermal insulation of circuit walls using EPS 100F tl. 160 mmInsulated part of the soil by means of mineral wool Insulation of the walking part of the soil with mineral wool The insulation of the ceiling above the annex by spray insulation The insulation of the walls to the unheated soil by 140 mm EPS 100FInsulation of the roof above the staircase using 240 mm mineral waddingInstallation of forced ventilation system with recuperationCregulation...
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 11,485 bytes −888 Removed claim: summary (P836): Insulation of circuit wall insulation with EPS 100F tl. 160 mmcranking of soil by mineral wadding insulation of the previous part of the soil by means of mineral wadding insulation of the ceiling of the pier by means of sprayed insulation of walls to non-heated soil by means of 140 mm EPS 100FZahinsulation of the roof over the staircase by means of 240 mm of mineral vapor insulation of the system of forced ventilation with a recuperation aimed...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0120:01, 26 February 2020DG Regio talk contribs 11,101 bytes +888 Created claim: summary (P836): Insulation of circuit wall insulation with EPS 100F tl. 160 mmcranking of soil by mineral wadding insulation of the previous part of the soil by means of mineral wadding insulation of the ceiling of the pier by means of sprayed insulation of walls to non-heated soil by means of 140 mm EPS 100FZahinsulation of the roof over the staircase by means of 240 mm of mineral vapor insulation of the system of forced ventilation with a recuperation aimed a...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020