Revision history of "Improvement of the thermal technical condition of the Post Office object" (Q72926)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 52,115 bytes −4 Changed label, description and/or aliases in pt
  • curprev 04:5104:51, 13 October 2024DG Regio talk contribs 52,119 bytes +4 Set a claim value: summary (P836): O projeto resolve o isolamento de estruturas de perímetro e troca de preenchimentos de furos externos e isolamento de tetos, a fim de reduzir o desempenho energético do edifício de acordo com a variante recomendada da Revisão Energética.A principal atividade do projeto é a execução de obras de construção, o objetivo do projeto é reduzir o desempenho energético do edifício e reduzir as emissões, especialmente de CO2. O pré-requisito para o êxito do p...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:1713:17, 25 July 2022DG Regio talk contribs 49,445 bytes +28,396 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 14,689 bytes +1,537 Created claim: summary (P836): Le projet résout l’isolation des structures périmétriques et le remplacement des remplissages extérieurs d’ouverture et de l’isolation des plafonds afin de réduire la performance énergétique du bâtiment selon la version recommandée de l’évaluation de l’énergie. L’activité principale du projet est l’exécution des travaux de construction, l’objectif du projet est de réduire la performance énergétique du bâtiment et en particulier de réduire les ém...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,152 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 13,476 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 13,345 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 13,461 bytes +1,427 Created claim: summary (P836): The project solves insulation of perimeter structures and exchange of external hole fillings and insulation of ceilings in order to reduce the energy performance of the building according to the recommended variant of the Energy Review.The main activity of the project is the execution of construction works, the aim of the project is to reduce the energy performance of the building and reduce emissions especially CO2. The prerequisite for the suc...
  • curprev 20:5020:50, 23 October 2020DG Regio talk contribs 12,034 bytes −1,021 Removed claim: summary (P836): The project addresses the insulation of peripheral structures and the replacement of external ends by filling the ceilings with a view to reducing the energy performance of the building in accordance with the recommended policy option of the Energy Assessment. the main activity of the project is the execution of construction works, the objective of the project is the improvement of the energy performance of the building and the reduction of em...

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0120:01, 26 February 2020DG Regio talk contribs 11,764 bytes +1,021 Created claim: summary (P836): The project addresses the insulation of peripheral structures and the replacement of external ends by filling the ceilings with a view to reducing the energy performance of the building in accordance with the recommended policy option of the Energy Assessment. the main activity of the project is the execution of construction works, the objective of the project is the improvement of the energy performance of the building and the reduction of emis...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020