Revision history of "Reducing the energy performance of the public building in ul. 17 November 861 Jicin" (Q72876)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 13:1013:10, 25 July 2022DG Regio talk contribs 48,053 bytes +27,773 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0401:04, 29 November 2021DG Regio talk contribs 14,024 bytes +1,408 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de mesures structurelles et techniques complexes visant à améliorer la performance énergétique d’un bâtiment public dans la rue. 17 novembre no 861 Jičín. Les mesures consistent à isoler l’enveloppe du bâtiment, y compris une reconstruction partielle de son boîtier, le remplacement des ouvertures (fenêtres et portes) et l’isolation du toit d’un bâtiment de plusieurs étages. Les avantages de la mise en œuvr...
  • curprev 01:0401:04, 29 November 2021DG Regio talk contribs 12,616 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:0021:00, 23 October 2020DG Regio talk contribs 12,902 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:0021:00, 23 October 2020DG Regio talk contribs 12,760 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:0021:00, 23 October 2020DG Regio talk contribs 12,905 bytes +1,335 Created claim: summary (P836): The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of the public building in ul. November 17, 861 Jicin. The measures consist of the insulated cover of the building, including the partial reconstruction of its casing, the replacement of the opening fillings (windows and doors) and the insulation of the roof of the multi-storey building. The project will benefit from reducing...
  • curprev 21:0021:00, 23 October 2020DG Regio talk contribs 11,570 bytes −879 Removed claim: summary (P836): The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy con...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 19:5819:58, 26 February 2020DG Regio talk contribs 11,167 bytes +879 Created claim: summary (P836): The project involves the implementation of complex technical measures to reduce the energy performance of the public building in ul. On 17 November 861, Mr Jičín. The measures consist of insulation of the envelope of the building, including partial refurbishment of the envelope, filling the holes (windows and doors) and insulation of the roof of a multi-storey building. The implementation of the project will benefit the reduction of energy consu...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020