Revision history of "Reducing the energy performance of the building of the Municipal Office Svídnice" (Q72798)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:3104:31, 13 October 2024DG Regio talk contribs 48,217 bytes −2 Changed label, description and/or aliases in pt
  • curprev 04:3104:31, 13 October 2024DG Regio talk contribs 48,219 bytes +36 Set a claim value: summary (P836): O objetivo do projeto é reduzir o desempenho energético do edifício do Escritório Municipal Svídnice, no 36, Svídnice. O projeto trata do isolamento de fachadas, isolamento de telhados, teto de solo e piso acima do exterior, troca de preenchimentos de orifícios, troca de fonte de calor, reconstrução do sistema de aquecimento em 1. NP e a construção de um novo sistema de aquecimento em 2. IT’S AN NP (não traduzido para português).

12 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 12:5912:59, 25 July 2022DG Regio talk contribs 44,479 bytes +25,393 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,561 bytes +1,279 Created claim: summary (P836): Le projet a pour objet l ‘amélioration de la performance énergétique du bâtiment de l’ Office municipal de Svídnice, No 36, Svídnice. Le projet résout l’isolation des façades, l’isolation du toit, du plafond et du sol au-dessus de l’extérieur, le remplacement des trous de remplissage, le remplacement de la source de chaleur, la reconstruction du système de chauffage en 1. NP et construction d’un nouveau système de chauffage en 2. NP, translated_...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 12,282 bytes +150 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5920:59, 23 October 2020DG Regio talk contribs 12,581 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,441 bytes −156 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,597 bytes +1,220 Created claim: summary (P836): The object of the project is to reduce the energy performance of the building of the Municipal Office Svídnice, No. 36, Svídnice. The project deals with insulation of façades, roof insulation, ceiling of soil and floor above exterior, exchange of fillings of holes, exchange of heat source, reconstruction of heating system in 1. NP and the construction of a new heating system in 2. IT’S AN NP., translated_summary
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 11,377 bytes −815 Removed claim: summary (P836): The purpose of the project is the improvement of the energy performance of the building of the municipality of Svídnice, No 36, of the Svídnice. The project addresses the insulation of the façade, the insulation of the roof, the ceiling of the land and the floor over the exterior, the exchange of holes, the replacement of the heat generator, the renovation of the heating system in 1. NP and construction of a new heating system at 2. NP., remov...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0320:03, 26 February 2020DG Regio talk contribs 10,928 bytes +815 Created claim: summary (P836): The purpose of the project is the improvement of the energy performance of the building of the municipality of Svídnice, No 36, of the Svídnice. The project addresses the insulation of the façade, the insulation of the roof, the ceiling of the land and the floor over the exterior, the exchange of holes, the replacement of the heat generator, the renovation of the heating system in 1. NP and construction of a new heating system at 2. NP., Adding...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020