Revision history of "Realisation of energy savings – Municipal Office Polička, Palackýho nám.160" (Q72782)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:2704:27, 13 October 2024DG Regio talk contribs 51,393 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:2704:27, 13 October 2024DG Regio talk contribs 51,393 bytes +17 Set a claim value: summary (P836): O objetivo do projeto é reduzir o desempenho energético do edifício, que consiste no isolamento da estrutura do teto acima de 2NP, na implementação do sistema de isolamento de contacto (ETICS) da alvenaria do perímetro na parte do pátio do edifício, na substituição de preenchimentos de orifícios na envolvente do edifício e na substituição da fonte de aquecimento pela reconstrução do sistema de aquecimento de água quente existente (para além do apoio...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 12:5712:57, 25 July 2022DG Regio talk contribs 48,192 bytes +27,916 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0101:01, 29 November 2021DG Regio talk contribs 14,055 bytes +1,441 Created claim: summary (P836): L’objet du projet est de réduire la performance énergétique du bâtiment consistant en l’isolation de la structure de plafond au-dessus du 2ème étage, la mise en œuvre du système d’isolation de contact (ETICS) de la maçonnerie périmétrique dans la partie cour du bâtiment, le remplacement des trous dans l’enveloppe du bâtiment et le remplacement de la source de chauffage par la reconstruction du système existant de chauffage à l’eau chaude (au-del...
  • curprev 01:0101:01, 29 November 2021DG Regio talk contribs 12,614 bytes +154 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:4220:42, 23 October 2020DG Regio talk contribs 12,909 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:4220:42, 23 October 2020DG Regio talk contribs 12,770 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:4220:42, 23 October 2020DG Regio talk contribs 12,914 bytes +1,380 Created claim: summary (P836): The object of the project is to reduce the energy performance of the building consisting of insulation of the ceiling structure above 2NP, the implementation of the contact insulation system (ETICS) of the perimeter masonry in the yard part of the building, the replacement of hole fillings in the envelope of the building and the replacement of the heating source with reconstruction of the existing hot water heating system (beyond the support of...
  • curprev 20:4220:42, 23 October 2020DG Regio talk contribs 11,534 bytes −975 Removed claim: summary (P836): The purpose of the project is the improvement of the energy performance of the building consisting of insulation of ceiling construction over the 2-NP, the execution of the building interface system (ETICS) in the place of the building, the replacement of the selector in the envelope of the building and the replacement of the heating fuel with the reconstruction of the existing hot-water system (in addition to the aid for the Environment OP)....

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:0320:03, 26 February 2020DG Regio talk contribs 11,243 bytes +975 Created claim: summary (P836): The purpose of the project is the improvement of the energy performance of the building consisting of insulation of ceiling construction over the 2-NP, the execution of the building interface system (ETICS) in the place of the building, the replacement of the selector in the envelope of the building and the replacement of the heating fuel with the reconstruction of the existing hot-water system (in addition to the aid for the Environment OP). T...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020