Revision history of "Insulation of the administrative building TSM Kraslice" (Q72758)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 12:5312:53, 25 July 2022DG Regio talk contribs 42,444 bytes +23,792 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 13,357 bytes +1,242 Created claim: summary (P836): Le projet comprend l’isolation du bâtiment des services techniques de la ville de Kraslice, no 1910. Le projet résout l’isolation de la maçonnerie périmétrique avec un système d’isolation de contact certifié, l’isolation de l’espace inférieur, le remplacement des portes et une partie des fenêtres (une partie des fenêtres ont déjà été remplacées). Le bâtiment appartient à la ville de Kraslice., translated_summary
  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 12,115 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:4120:41, 23 October 2020DG Regio talk contribs 12,449 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:4120:41, 23 October 2020DG Regio talk contribs 12,336 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:4120:41, 23 October 2020DG Regio talk contribs 12,448 bytes +1,160 Created claim: summary (P836): The project concerns insulation of the Technical Services of Kraslice, No. 1910. The project solves insulation of perimeter masonry with certified contact insulation system, insulation of the sub-roof space, replacement of doors and part of windows (part of windows has already been replaced). The building is owned by the town of Kraslice., translated_summary
  • curprev 20:4120:41, 23 October 2020DG Regio talk contribs 11,288 bytes −781 Removed claim: summary (P836): The project involves the insulation of the building of the Technical Services of the City of Krusice, No 1910. The project deals with the insulation of the circumferential zdiva with a certified contact warm system, the insulation of the roof space, the exchange of gates and the part of the windows (the window of windows has already been replaced). An object is located in the assets of the town of Krusice., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0320:03, 26 February 2020DG Regio talk contribs 10,780 bytes +781 Created claim: summary (P836): The project involves the insulation of the building of the Technical Services of the City of Krusice, No 1910. The project deals with the insulation of the circumferential zdiva with a certified contact warm system, the insulation of the roof space, the exchange of gates and the part of the windows (the window of windows has already been replaced). An object is located in the assets of the town of Krusice., Adding English summary

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020