Revision history of "Reducing the energy performance of SUPŠ Bechyně objects" (Q72593)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 04:0004:00, 13 October 2024DG Regio talk contribs 46,996 bytes −4 Set a claim value: summary (P836): O projeto trata da redução do desempenho energético dos edifícios da escola secundária de arte para o ensino e a educação. O edifício da escola está localizado na rua.Písecká, no terreno da Obra No 964 na área cadastral de Bechyně [601543]. As medidas propostas para reduzir o desempenho energético do edifício incluem o isolamento total da envolvente do edifício, a instalação de VZT com recuperação e a implementação da gestão energética.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 12:2812:28, 25 July 2022DG Regio talk contribs 45,860 bytes +26,245 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 13,771 bytes +1,382 Created claim: summary (P836): Le projet porte sur l’amélioration de la performance énergétique des bâtiments de l’École secondaire des arts appliqués pour l’enseignement et l’éducation. Les bâtiments de l’école sont situés dans la rue.Písecká, sur le terrain d’ouvrage no 964 sur le territoire cadastral de Bechyně [601543]. Les mesures proposées pour améliorer la performance énergétique du bâtiment comprennent l’isolation complète de l’enveloppe du bâtiment, l’installation de...
  • curprev 01:0301:03, 29 November 2021DG Regio talk contribs 12,389 bytes +131 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 12,707 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 12,591 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 12,691 bytes +1,279 Created claim: summary (P836): The project deals with reducing the energy performance of the buildings of the secondary art school for teaching and education. The school building is located in the street.Písecká, on the land of Work No. 964 in the cadastral area of Bechyně [601543]. The proposed measures to reduce the energy performance of the building include complete insulation of the building envelope, installation of VZT with recuperation and implementation of energy mana...
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 11,412 bytes −842 Removed claim: summary (P836): The project addresses the improvement of the energy performance of buildings of secondary artistic schools in teaching and learning. The schools’ buildings are located in the Culic.Písecká, on land under construction No. 964 in the cadastral area Bechnivni [601543]. The proposed measures to reduce the energy demand of the building include complete insulation of the envelope of the building, the installation of the model and the introduction of...

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:1320:13, 26 February 2020DG Regio talk contribs 10,964 bytes +842 Created claim: summary (P836): The project addresses the improvement of the energy performance of buildings of secondary artistic schools in teaching and learning. The schools’ buildings are located in the Culic.Písecká, on land under construction No. 964 in the cadastral area Bechnivni [601543]. The proposed measures to reduce the energy demand of the building include complete insulation of the envelope of the building, the installation of the model and the introduction of e...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020