Revision history of "Reducing the energy intensity of the gymnasium Primary School of the King’s Court" (Q72575)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:4713:47, 13 October 2024DG Regio talk contribs 49,522 bytes +3 Changed label, description and/or aliases in pt
  • curprev 13:4713:47, 13 October 2024DG Regio talk contribs 49,519 bytes +8 Set a claim value: summary (P836): O projeto resolve a renovação da extensão da escola primária (ginásio e duas turmas) através do isolamento total do invólucro exterior e do telhado do edifício, substituindo os enchimentos existentes de aberturas e a instalação da unidade de ventilação por recuperação. O objetivo é reduzir o desempenho energético do edifício, o que resultará numa diminuição dos custos de funcionamento do edifício e numa redução do volume de poluição emitida.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 12:2612:26, 25 July 2022DG Regio talk contribs 45,809 bytes +26,357 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 13,700 bytes +1,310 Created claim: summary (P836): Le projet porte sur la rénovation de l’extension de l’école primaire (salles de formation corporelle et deux classes) par l’isolation globale de l’enveloppe du bâtiment et du toit, en remplaçant les remplissages existants des ouvertures et en installant une unité de climatisation par récupération. L’objectif est de réduire la performance énergétique du bâtiment, ce qui réduira également les coûts d’exploitation du bâtiment et la quantité de poll...
  • curprev 01:0201:02, 29 November 2021DG Regio talk contribs 12,390 bytes +136 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:5021:50, 23 October 2020DG Regio talk contribs 12,703 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5021:50, 23 October 2020DG Regio talk contribs 12,561 bytes −153 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5021:50, 23 October 2020DG Regio talk contribs 12,714 bytes +1,269 Created claim: summary (P836): The project solves the renovation of the extension of the primary school (gymnasium and two classes) by total insulation of the building’s outer shell and roof, replacing existing fillings of openings and installation of the ventilation unit with recuperation. The aim is to reduce the energy performance of the building, which will result in a decrease in the costs of operation of the building and a reduction in the volume of pollution emitted.,...
  • curprev 21:5021:50, 23 October 2020DG Regio talk contribs 11,445 bytes −788 Removed claim: summary (P836): The project deals with the renovation of the connecting schools (gymnasiums and two classes) of the total perimeter of the building and roof envelope, the replacement of the existing outlets and the installation of the energy storage unit with recovery. The aim is to reduce the energy performance of a building, resulting in a fall in the cost of operating the building and reducing the volume of emitted pollution., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 20:1320:13, 26 February 2020DG Regio talk contribs 10,973 bytes +788 Created claim: summary (P836): The project deals with the renovation of the connecting schools (gymnasiums and two classes) of the total perimeter of the building and roof envelope, the replacement of the existing outlets and the installation of the energy storage unit with recovery. The aim is to reduce the energy performance of a building, resulting in a fall in the cost of operating the building and reducing the volume of emitted pollution., Adding English summary

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020