Revision history of "Road I/11 Nebory – Oldřichovice – Bystrice (2nd phase)" (Q72441)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 12:0412:04, 25 July 2022DG Regio talk contribs 47,881 bytes +27,677 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 14,049 bytes +1,449 Created claim: summary (P836): L’objet du projet est la construction du déplacement de la route I/11 dans la catégorie S 24,5/100 sur la longueur totale de la route principale 11,099 km (bâtiment I/11 Nebory — Oldřichovice 4,860 km et construction I/11 Oldřichovice — Bystřice 6,239 km), avec deux voies dans chaque direction et une connexion supplémentaire des routes d’intersection. La nouvelle route I/11 dans le tronçon Nebory — Oldřichovice — Bystřice fait partie de la solut...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,600 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,930 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,810 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,931 bytes +1,383 Created claim: summary (P836): The object of the project is the construction of the relocation of road I/11 in category S 24,5/100 in the total length of the main route 11.099 km (construction I/11 Nebory – Oldřichovice 4.860 km and construction I/11 Oldřichovice – Bystřice 6.239 km), with two lanes in each direction and an off-level connection of roads. The newly built road I/11 in the section Nebory – Oldřichovice – Bystřice is part of the definitive solution for connecting...
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 11,548 bytes −903 Removed claim: summary (P836): The purpose of the project is the construction of I/11 in category S 24,5/100, in category S 11,099, in the order of km (construction I/11 Neory — Oldřichovice 4.860 km and construction I/11 Oldrich — Bystrice 6.239 km), two lanes in each direction and an extra-level connection of roads. The newly built I/11 road in the Neory — Oldřichovice — Bystřice, is part of the definitive solution of the link between the D48 motorway and the Slovak Repub...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5719:57, 26 February 2020DG Regio talk contribs 11,180 bytes +903 Created claim: summary (P836): The purpose of the project is the construction of I/11 in category S 24,5/100, in category S 11,099, in the order of km (construction I/11 Neory — Oldřichovice 4.860 km and construction I/11 Oldrich — Bystrice 6.239 km), two lanes in each direction and an extra-level connection of roads. The newly built I/11 road in the Neory — Oldřichovice — Bystřice, is part of the definitive solution of the link between the D48 motorway and the Slovak Republi...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020