Revision history of "D1 Modernisation – section 16, EXIT 119 Velký Beranov – EXIT 134 Měřín" (Q72426)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:1513:15, 13 October 2024DG Regio talk contribs 49,568 bytes 0 Changed label, description and/or aliases in pt
  • curprev 13:1513:15, 13 October 2024DG Regio talk contribs 49,568 bytes −10 Set a claim value: summary (P836): O projeto tem por objeto a modernização da autoestrada D1 no troço Velké Beranov – Měřín, numa extensão de 14 711 km. A modernização propriamente dita consiste em alargar à categoria D 28 ou 2 correias com uma largura reforçada de 11,5 m e melhorar o estado de construção da autoestrada. Estas modificações contribuirão para um aumento substancial da segurança e da continuidade da operação nesta comunicação fortemente carregada, além de atrasar os rep...

20 March 2024

15 January 2024

12 June 2023

1 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 12:0212:02, 25 July 2022DG Regio talk contribs 46,626 bytes +26,974 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,803 bytes +1,342 Created claim: summary (P836): L’objet du projet est la modernisation de l’autoroute D1 dans le tronçon Velké Beranov — Meřín d’une longueur de 14,711 km. La modernisation proprement dite consiste à étendre les voies des catégories D 28 et 2 d’une largeur de 11,5 m et à améliorer la construction et l’état technique de l’autoroute. Ces modifications contribueront à accroître considérablement la sécurité et le bon fonctionnement de cette communication lourdement lourde, ainsi q...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,461 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,774 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,635 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 12,775 bytes +1,290 Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Velké Beranov – Měřín in the length of 14.711 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying...
  • curprev 21:4421:44, 23 October 2020DG Regio talk contribs 11,485 bytes −886 Removed claim: summary (P836): The purpose of the project is the modernisation of the D1 motorway in the section Velký Beranov — 14.711 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily load...

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5719:57, 26 February 2020DG Regio talk contribs 11,100 bytes +886 Created claim: summary (P836): The purpose of the project is the modernisation of the D1 motorway in the section Velký Beranov — 14.711 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of traffic on this heavily loaded...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020