Revision history of "D1 Modernisation – section 22, EXIT 162 Velká Bíteš – EXIT 168 Nine crosses" (Q72400)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:0913:09, 13 October 2024DG Regio talk contribs 49,618 bytes 0 Changed label, description and/or aliases in pt
  • curprev 13:0913:09, 13 October 2024DG Regio talk contribs 49,618 bytes −10 Set a claim value: summary (P836): O projeto tem por objeto a modernização da autoestrada D1 no troço Velka Bíteš – Nove Cruzes (km 162,750-168,170) num comprimento de 5,420 km. A modernização propriamente dita consiste em alargar à categoria D 28 ou 2 correias com uma largura reforçada de 11,5 m e melhorar o estado de construção da autoestrada. Estas modificações contribuirão para um aumento substancial da segurança e da continuidade da operação nesta comunicação fortemente carregad...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:5811:58, 25 July 2022DG Regio talk contribs 47,939 bytes +27,574 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 14,402 bytes +1,366 Created claim: summary (P836): Le projet a pour objet la modernisation de l’autoroute D1 dans le tronçon Velká Bíteš — Nine Crosses (km 162.750-168.170) d’une longueur de 5,420 km. La modernisation proprement dite consiste à étendre les voies des catégories D 28 et 2 d’une largeur de 11,5 m et à améliorer la construction et l’état technique de l’autoroute. Ces modifications contribueront à accroître considérablement la sécurité et le bon fonctionnement de cette communication...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,036 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 13,346 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 13,203 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 13,329 bytes +1,313 Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Velka Bíteš – Nine Crosses (km 162.750-168.170) in the length of 5.420 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communica...
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,016 bytes −933 Removed claim: summary (P836): The subject of the project is the modernisation of the D1 motorway on the Grand Bíteš — Dephrases of a cross (km 162,750-168,170) of a length of 5.420 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the s...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5719:57, 26 February 2020DG Regio talk contribs 11,679 bytes +933 Created claim: summary (P836): The subject of the project is the modernisation of the D1 motorway on the Grand Bíteš — Dephrases of a cross (km 162,750-168,170) of a length of 5.420 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the saf...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020