Revision history of "Highway D3, construction 0309/II Ševětín – Borek" (Q72376)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:0713:07, 13 October 2024DG Regio talk contribs 48,638 bytes 0 Changed label, description and/or aliases in pt
  • curprev 13:0713:07, 13 October 2024DG Regio talk contribs 48,638 bytes +14 Set a claim value: summary (P836): O projeto consiste na construção da autoestrada D3 no troço 0309/II Ševětín – Borek. Trata-se de uma extensão da estrada existente I/3, que já foi construída como uma auto-estrada semi-perfil, para o perfil da auto-estrada da categoria D 27,5/120 10,680 km de comprimento. A construção da autoestrada D3 melhorará significativamente o fluxo de tráfego e aumentará a segurança do tráfego. Do ponto de vista ambiental, o funcionamento contínuo reduzirá as...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:5411:54, 25 July 2022DG Regio talk contribs 46,423 bytes +26,724 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,891 bytes +1,409 Created claim: summary (P836): Le projet a pour objet la construction de l’autoroute D3 dans la section 0309/II Ševětín — Borek. Il s’agit de l’extension de la route existante I/3, qui a déjà été construite en tant que demi-profil de l’autoroute, jusqu’au profil d’autoroute de la catégorie D 27.5/120 d’une longueur de 10,680 km. La mise en œuvre de la construction de l’autoroute D3 améliorera considérablement la circulation et la sécurité. Du point de vue environnemental, le...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,482 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,817 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,703 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,817 bytes +1,313 Created claim: summary (P836): The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emission...
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 11,504 bytes −898 Removed claim: summary (P836): The purpose of the project is the construction of the D3 motorway in 0309/II Ševetín — Borek. This is the extension of the existing road I/3, which was already constructed as a half of the profile of the motorway, to a 10.680 km motorway profile of category D 27,5/120. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduct...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5719:57, 26 February 2020DG Regio talk contribs 11,134 bytes +898 Created claim: summary (P836): The purpose of the project is the construction of the D3 motorway in 0309/II Ševetín — Borek. This is the extension of the existing road I/3, which was already constructed as a half of the profile of the motorway, to a 10.680 km motorway profile of category D 27,5/120. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reductio...