Revision history of "Highway D3, construction 0309/I Bošilec – Ševětín" (Q72373)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:5411:54, 25 July 2022DG Regio talk contribs 43,685 bytes +24,851 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,523 bytes +1,256 Created claim: summary (P836): Le projet a pour objet la construction de l’autoroute D3 de la catégorie D 27.5/120 dans la section 0309/I Bošilec — Ševětín d’une longueur totale de 8,137 km. La mise en œuvre de la construction de l’autoroute D3 améliorera considérablement la circulation et la sécurité. Du point de vue environnemental, le bon fonctionnement permettra de réduire les émissions totales des transports autour de la route existante., translated_summary
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,267 bytes +116 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,600 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,484 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,600 bytes +1,220 Created claim: summary (P836): The object of the project is the construction of the D3 motorway category D 27,5/120 in the section 0309/I Bošilec – Ševětín with a total length of 8.137 km. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road., translated_summary
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 11,380 bytes −789 Removed claim: summary (P836): The purpose of the project is the construction of a D3 motorway of category D 27,5/120, in section 0309/I, Bošilec — Ševetín, of an overall length of 8.137 km. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduction in overall transport emissions in the area surrounding existing roads., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:5719:57, 26 February 2020DG Regio talk contribs 10,888 bytes +789 Created claim: summary (P836): The purpose of the project is the construction of a D3 motorway of category D 27,5/120, in section 0309/I, Bošilec — Ševetín, of an overall length of 8.137 km. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduction in overall transport emissions in the area surrounding existing roads., Adding English summary