Revision history of "Junction Pilsen, 1st construction – reconstruction of Prague head – Phase II" (Q72367)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:0513:05, 13 October 2024DG Regio talk contribs 51,270 bytes +1 Changed label, description and/or aliases in pt
  • curprev 13:0513:05, 13 October 2024DG Regio talk contribs 51,269 bytes +9 Set a claim value: summary (P836): O projeto «Knot Pilsen, 1.a construção – reconstrução da cabeça de Praga» é um dos elementos da modernização da rede RTE-T. O TŽK não é apenas uma ligação nacional significativa, mas também uma ligação de trânsito da Alemanha para a Eslováquia. O objetivo da construção é fornecer parâmetros básicos das linhas modernizadas, incluindo a modernização do equipamento de comunicação e sinalização e das catenárias. A execução do projeto está concentrada na...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:5311:53, 25 July 2022DG Regio talk contribs 49,573 bytes +28,553 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5600:56, 29 November 2021DG Regio talk contribs 15,547 bytes +1,486 Created claim: summary (P836): Le projet «Uzel Plzeň, 1ère construction — reconstruction du siège de Prague» est l’un des éléments de la modernisation du réseau RTE-T. Il se trouve sur la route III. TŽK et représente non seulement une liaison nationale importante, mais aussi une liaison de transit entre l’Allemagne et la Slovaquie. L’objectif de la construction est de fournir les paramètres de base des lignes modernisées, y compris la modernisation de l’équipement de communic...
  • curprev 00:5600:56, 29 November 2021DG Regio talk contribs 14,061 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 14,365 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 14,224 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 14,353 bytes +1,379 Created claim: summary (P836): The project “Knot Pilsen, 1st construction – reconstruction of Prague head” is one of the elements of the modernisation of the TEN-T network. TŽK is not only a significant national link, but also a transit link from Germany to Slovakia. The aim of the construction is to provide basic parameters of modernised lines including modernisation of communication and signalling equipment and overhead contact lines. The implementation of the project is co...
  • curprev 21:4321:43, 23 October 2020DG Regio talk contribs 12,974 bytes −923 Removed claim: summary (P836): The project “Building Plzeň, 1. construction — A transformation of Prague sex” is one of the elements of the upgrading of the TEN-T. it is located on route III. TŽK is not only a significant national connection but also a transit link from Germany to Slovakia. The aim of the building is to provide the basic parameters of the upgraded lines, including the upgrading of the signalling and signalling equipment and of the traction lines. The implem...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5119:51, 26 February 2020DG Regio talk contribs 12,230 bytes +923 Created claim: summary (P836): The project “Building Plzeň, 1. construction — A transformation of Prague sex” is one of the elements of the upgrading of the TEN-T. it is located on route III. TŽK is not only a significant national connection but also a transit link from Germany to Slovakia. The aim of the building is to provide the basic parameters of the upgraded lines, including the upgrading of the signalling and signalling equipment and of the traction lines. The implemen...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020