Revision history of "Reconstruction of the Kunčický head in the railway station. Ostrava Vítkovice – Phase 2" (Q72349)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 13:0413:04, 13 October 2024DG Regio talk contribs 47,645 bytes +3 Changed label, description and/or aliases in pt
  • curprev 13:0413:04, 13 October 2024DG Regio talk contribs 47,642 bytes +1 Set a claim value: summary (P836): O edifício está localizado na cabeça Kunčický na estação ferroviária. Ostrava-Vítkovice na linha nacional eletrificada de duas vias Český Těšín – Polanka nad Odrou, odb.Odra – Ostrava-Svinov, que faz parte da rede RTE-T. O estado técnico da maioria dos edifícios e das tecnologias operacionais é deficiente, a configuração da via também não é adequada do ponto de vista operacional.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:5011:50, 25 July 2022DG Regio talk contribs 45,712 bytes +25,550 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5600:56, 29 November 2021DG Regio talk contribs 15,194 bytes +1,337 Created claim: summary (P836): La construction est située sur le quartier général de Kunčice à la gare ferroviaire. Ostrava-Vítkovice sur une ligne nationale électrifiée à deux voies Český Těšín — Polanka nad Odrou, odb.Odra — Ostrava-Svinov, qui fait partie du réseau RTE-T. Actuellement, la vitesse de la ligne est de 80 km/h. L’état technique de la plupart des bâtiments et des technologies d’exploitation est médiocre, la configuration des gares de triage est également insati...
  • curprev 00:5600:56, 29 November 2021DG Regio talk contribs 13,857 bytes +169 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 14,137 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 13,984 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 14,126 bytes +1,229 Created claim: summary (P836): The building is located on the Kunčický head in the railway station. Ostrava-Vítkovice on the two-track electrified national line Český Těšín – Polanka nad Odrou, odb.Odra – Ostrava-Svinov, which is part of the TEN-T network. The technical condition of most building buildings and operating technologies is poor, the configuration of the track is also unsuitable from an operational point of view., translated_summary
  • curprev 21:2521:25, 23 October 2020DG Regio talk contribs 12,897 bytes −799 Removed claim: summary (P836): The construction is situated on a secondary sex. Ostrava-Vítkovice on the double-track electrified State line, Český Těšín — Polanka nad Odrou, odb.Oder — Ostrava-Svinov, which is part of the TEN-T network. currently there is a track speed of 80 km/h. The technical status of most construction and operating technology is poor, the configuration of the track is also unsatisfactory from an operational point of view., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 12,024 bytes +799 Created claim: summary (P836): The construction is situated on a secondary sex. Ostrava-Vítkovice on the double-track electrified State line, Český Těšín — Polanka nad Odrou, odb.Oder — Ostrava-Svinov, which is part of the TEN-T network. currently there is a track speed of 80 km/h. The technical status of most construction and operating technology is poor, the configuration of the track is also unsatisfactory from an operational point of view., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020