Revision history of "Modernisation of the line Veselí n.L. – Tábor – II.part, section Veselí n. L. – Doubí u Tábora, 2nd stage Soběslav – Doubí" (Q72308)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5912:59, 13 October 2024DG Regio talk contribs 49,497 bytes −1 Changed label, description and/or aliases in pt
  • curprev 12:5912:59, 13 October 2024DG Regio talk contribs 49,498 bytes −16 Set a claim value: summary (P836): O IV Corredor de Trânsito Ferroviário é também modernizado com base no conceito adotado de desenvolvimento da rede ferroviária. O objeto do projeto é a sua parte — o troço entre a estação de Soběslav (onde a fase anterior da construção, o troço Veselí nad Lužnicí (fora) — Soběslav, concluído em 2015) e a paragem Doubí u Tábora (incluindo). Aqui, a linha segue o troço completo Tábor – Doubí u Tábora, lançado em 2009.

22 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:4311:43, 25 July 2022DG Regio talk contribs 47,826 bytes +27,682 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5900:59, 29 November 2021DG Regio talk contribs 14,902 bytes +1,330 Created claim: summary (P836): Le quatrième corridor de transit ferroviaire est également modernisé sur la base du concept adopté pour le développement du réseau ferroviaire. L’objet du projet est sa partie — le tronçon entre la gare Soběslav (où il suit l’étape précédente de la construction, le tronçon Veselí nad Lužnicí (extérieur) — Soběslav, achevé en 2015) et le Doubí u Tábor (inclus). Ici, la ligne suit le tronçon terminé Tábor — Doubí u Tábora à l’avance, qui a été mis...
  • curprev 00:5900:59, 29 November 2021DG Regio talk contribs 13,572 bytes +201 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,820 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,621 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,813 bytes +1,301 Created claim: summary (P836): The IV Railway Transit Corridor is also modernised on the basis of the adopted concept of the railway network development. The object of the project is its part – the section between the station Soběslav (where the previous phase of the construction, the section Veselí nad Lužnicí (outside) – Soběslav, completed in 2015) and the stop stop Doubí u Tábora (including). Here the line follows the completed section Tábor – Doubí u Tábora in advance, l...
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 12,512 bytes −896 Removed claim: summary (P836): On the basis of the adopted concept for the development of the rail network, the fourth transit railway corridor is being upgraded. The subject of the project is part of the project — a section between the Slunslav station (which follows the previous stage of construction, the section Veselí nad Lužnicí (outside) — Soběslav, completed in 2015) and the pledge of Doubí u Tábora (inclusive). This follows the completion of the completed section of...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 11,740 bytes +896 Created claim: summary (P836): On the basis of the adopted concept for the development of the rail network, the fourth transit railway corridor is being upgraded. The subject of the project is part of the project — a section between the Slunslav station (which follows the previous stage of construction, the section Veselí nad Lužnicí (outside) — Soběslav, completed in 2015) and the pledge of Doubí u Tábora (inclusive). This follows the completion of the completed section of t...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020