Revision history of "Reconstruction of the superstructure and TV on km 17.200-18.000 of the line Ústí nad Labem – Most" (Q72273)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5512:55, 13 October 2024DG Regio talk contribs 48,336 bytes +12 Changed label, description and/or aliases in pt
  • curprev 12:5512:55, 13 October 2024DG Regio talk contribs 48,324 bytes −3 Set a claim value: summary (P836): O projeto inclui a reconstrução da superestrutura no km 17 200-18 000 da linha n.o 130 Ústí nad Labem – Chomutov. A linha faz parte da rede RTE-T global. A reconstrução incluirá o alargamento das distâncias insatisfatórias dos eixos das vias, a modificação da linha de tração e a reconstrução da ponte em km 17.705 que se encontra atualmente em estado de emergência e tem uma velocidade reduzida de 40 km/h.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:3911:39, 25 July 2022DG Regio talk contribs 45,887 bytes +26,298 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 14,676 bytes +1,277 Created claim: summary (P836): Le contenu du projet est la reconstruction de la superstructure ferroviaire au km 17.200-18.000 de la ligne no 130 Ústí nad Labem — Chomutov. La ligne fait partie du réseau global du RTE-T. La reconstruction comprendra l’extension des distances du centre de voie non conformes, la modification de la ligne aérienne de contact et la reconstruction du pont au km 17.705, actuellement en état d’urgence et soumis à une vitesse réduite de 40 km/h., tran...
  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 13,399 bytes +193 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,655 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,492 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,654 bytes +1,249 Created claim: summary (P836): The project includes reconstruction of the superstructure on km 17.200-18.000 of the line No. 130 Ústí nad Labem – Chomutov. The line is part of the global TEN-T network. The reconstruction will include the extension of unsatisfactory axis distances of tracks, modification of the traction line and reconstruction of the bridge in km 17.705, which is currently in emergency condition and has a reduced speed of 40 km/h on it., translated_summary
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 12,405 bytes −801 Removed claim: summary (P836): The project content is the reconstruction of the railway track in km 17,200-18,000 of line No 130 of Ústí nad Labem — Chomutov. The line is part of the TEN-T comprehensive network and will include the extension of the non-compliant distance between track centres, the modification of the traction line and the rebuilding of the bridge in km 17,705, which is currently in the emergency state, with a reduced speed of 40 km/h., remove_old_english_tr...

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 11,532 bytes +801 Created claim: summary (P836): The project content is the reconstruction of the railway track in km 17,200-18,000 of line No 130 of Ústí nad Labem — Chomutov. The line is part of the TEN-T comprehensive network and will include the extension of the non-compliant distance between track centres, the modification of the traction line and the rebuilding of the bridge in km 17,705, which is currently in the emergency state, with a reduced speed of 40 km/h., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020