Revision history of "Reconstruction of the bridge on km 1,429 of the line Pňovany – Bezdružice" (Q72217)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 03:0603:06, 13 October 2024DG Regio talk contribs 50,225 bytes 0 Changed label, description and/or aliases in pt
  • curprev 03:0603:06, 13 October 2024DG Regio talk contribs 50,225 bytes −7 Set a claim value: summary (P836): O projeto inclui a reconstrução da ponte no km 1.429 na linha regional de via única Pňovany – Bezdružice (com designação no n.o 177). A ligação a esta linha é na estação. No Corredor de Trânsito II. Atualmente, os trens desta linha vão diretamente para Pilsen. A implementação do projeto eliminará o mau estado técnico de construção da ponte, o que reduz a transição de toda a seção da linha. A redução de velocidade que foi introduzida na ponte também...

23 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:3011:30, 25 July 2022DG Regio talk contribs 48,304 bytes +27,654 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 15,424 bytes +1,412 Created claim: summary (P836): Le contenu du projet est la reconstruction du pont en km 1.429 sur la ligne régionale à voie unique Pňovany — Bezdružice (avec le numéro de désignation 177). La connexion de cette ligne se fait à la station. Voie sur le troisième corridor de transit. Actuellement, les trains voyagent directement de cette ligne à Pilsen. La mise en œuvre du projet éliminera la mauvaise condition structurelle et technique du pont, ce qui réduit la transition de l’...
  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 14,012 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:2321:23, 23 October 2020DG Regio talk contribs 14,331 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2321:23, 23 October 2020DG Regio talk contribs 14,193 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2321:23, 23 October 2020DG Regio talk contribs 14,318 bytes +1,359 Created claim: summary (P836): The project includes reconstruction of the bridge on km 1,429 on the regional single-track line Pňovany – Bezdružice (with designation in nr. number 177). The connection to this line is at the station. On the rd Transit Corridor. Currently, trains from this line run directly to Pilsen. The implementation of the project will remove the poor construction-technical state of the bridge, which reduces the transition of the whole line section. The spe...
  • curprev 21:2321:23, 23 October 2020DG Regio talk contribs 12,959 bytes −918 Removed claim: summary (P836): The project content is the reconstruction of the bridge at km 1,429 on the regional single-track Pňovay — Bezsatellite (labelled in the OJ number 177). The connection of this line is in a žist. Pjovans, a third transit corridor. Trains are currently interested in trains from this line directly to Plzeň. The implementation of the project will lead to the removal of the poor building stock of the bridge, which reduces the transition of the entir...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 12,205 bytes +918 Created claim: summary (P836): The project content is the reconstruction of the bridge at km 1,429 on the regional single-track Pňovay — Bezsatellite (labelled in the OJ number 177). The connection of this line is in a žist. Pjovans, a third transit corridor. Trains are currently interested in trains from this line directly to Plzeň. The implementation of the project will lead to the removal of the poor building stock of the bridge, which reduces the transition of the entire...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020