Revision history of "ETCS Prague Uhříněves – Votice" (Q72201)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 50,813 bytes +1 Changed label, description and/or aliases in pt
  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 50,812 bytes +7 Set a claim value: summary (P836): No âmbito da construção do ETCS Praha Uhříněves – Votice, em conformidade com as obrigações em matéria de interoperabilidade para com a UE e com o plano nacional de implementação do ERTMS (Sistema Europeu de Gestão dos Transportes), será criado um sistema de proteção dos comboios que aumenta a segurança na rede ferroviária de SŽDC. O ETCS L2 permite o controlo total do condutor e assegura que este é informado sobre a viagem até ao ponto de paragem....

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 11:2711:27, 25 July 2022DG Regio talk contribs 47,623 bytes +27,675 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 14,886 bytes +1,437 Created claim: summary (P836): Dans le cadre de la construction de l’ETCS Praha Uhříněves — Votice, un système de protection des trains sera mis en place conformément aux obligations d’interopérabilité de l’UE et au plan national de mise en œuvre de l’ERTMS (European Traffic Management System), qui accroît la sécurité sur le réseau ferroviaire de SŽDC. Le système ETCS L2 permet un contrôle total du conducteur et veille à ce que le conducteur soit informé de la marche jusqu’à...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,449 bytes +94 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 13,804 bytes +96 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 13,708 bytes −96 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 13,804 bytes +1,388 Created claim: summary (P836): Within the framework of the construction ETCS Praha Uhříněves – Votice, in accordance with the obligations on interoperability towards the EU and with the National ERTMS Implementation Plan (European Transport Management System), a train protection system will be established which increases safety on the SŽDC railway network. The ETCS L2 allows full control of the driver and ensures that the driver is informed about the journey to the stop point...
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 12,416 bytes −923 Removed claim: summary (P836): As part of the construction of ETCS Prague Uhříněves — Votice, it will take place in accordance with its interoperability obligations towards the EU and the National ERTMS Implementation Plan (ERTMS) to establish a system of train protection which enhances safety on the railway network of SŽDC. ETCS L2 allows for full control of the driver and ensures that it is informed about the movement up to the stop point. At the same time, it makes it po...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 11,660 bytes +923 Created claim: summary (P836): As part of the construction of ETCS Prague Uhříněves — Votice, it will take place in accordance with its interoperability obligations towards the EU and the National ERTMS Implementation Plan (ERTMS) to establish a system of train protection which enhances safety on the railway network of SŽDC. ETCS L2 allows for full control of the driver and ensures that it is informed about the movement up to the stop point. At the same time, it makes it poss...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020