Revision history of "Insulation of the object and exchange of heat source SŠ Bor, Strážská 441, Bor" (Q72196)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 48,063 bytes 0 Changed label, description and/or aliases in pt
  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 48,063 bytes +13 Set a claim value: summary (P836): O objeto do projeto O isolamento do objeto e a troca da fonte de calor SŠ Bor, Strážská 441, Bor, é uma reconstrução do edifício, que proporcionará o isolamento necessário das estruturas de embalagem, a troca de janelas e portas de entrada, a troca da fonte de calor existente com bombas de calor, a ventilação forçada com recuperação de calor da sala de aula e do vestiário.

12 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 11:2711:27, 25 July 2022DG Regio talk contribs 44,346 bytes +25,188 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,590 bytes +1,282 Created claim: summary (P836): L’objet du projet Isolation du bâtiment et remplacement de la source thermique SŠ Bor, Strážská 441, Bor, est une reconstruction du bâtiment, dans lequel l’isolation nécessaire des structures d’emballage, le remplacement des fenêtres et des portes d’entrée, le remplacement de la source de chaleur existante par des pompes à chaleur, la ventilation forcée avec récupération de chaleur de la salle de classe et le vestiaire seront réalisés., translat...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,308 bytes +151 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 12,606 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 12,465 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 12,613 bytes +1,203 Created claim: summary (P836): The object of the project The insulation of the object and the exchange of heat source SŠ Bor, Strážská 441, Bor, is a reconstruction of the building, which will provide necessary insulation of packaging structures, exchange of windows and entrance doors, exchange of existing heat source with heat pumps, forced ventilation with heat recovery of the classroom and dressing room., translated_summary
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 11,410 bytes −751 Removed claim: summary (P836): The object of the renovation project and the replacement of the heat source at the School of Bob, Strážská 441, Bor, is the reconstruction of the building which will require the insulation of packaging structures, the replacement of windows and entrance doors, the replacement of existing heat sources from heat pumps, forced ventilation with heat recovery and changing rooms., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 10,902 bytes +751 Created claim: summary (P836): The object of the renovation project and the replacement of the heat source at the School of Bob, Strážská 441, Bor, is the reconstruction of the building which will require the insulation of packaging structures, the replacement of windows and entrance doors, the replacement of existing heat sources from heat pumps, forced ventilation with heat recovery and changing rooms., Adding English summary

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020