Revision history of "Line speed increase in the section Řikonín – Vlkov u Tišnova" (Q72195)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 50,199 bytes +8 Changed label, description and/or aliases in pt
  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 50,191 bytes −117 Set a claim value: summary (P836): A construção está localizada na linha nacional de duas vias n.o 250 Brno – Havlíčkův Brod, no troço Řikonín – Vlkov u Tišnova. A linha é eletrificada por tração alternada de 25 kV, a velocidade atual da linha é de 100 km/h. A parada de Níhov está localizada no trecho de linha resolvido, que também será objeto de reconstrução.Conteúdo da construção é a reconstrução da subestrutura ferroviária, superstrutura, pontes, túneis e equipamentos tecnológicos...

23 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:2711:27, 25 July 2022DG Regio talk contribs 48,620 bytes +27,842 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 15,464 bytes +1,438 Created claim: summary (P836): La construction est située sur la ligne nationale à deux voies n°250 Brno — Havlíčkův Brod dans la section «ikonín — Vlkov u Tišnova». La ligne est électrifiée par une traction alternée de 25 kV, la vitesse actuelle de la ligne est de 100 km/h. Dans le tronçon de ligne conçu, il y a un arrêt Níhov, qui fera également l’objet de reconstruction. Le contenu de la construction est la reconstruction de la sous-structure ferroviaire, superstructure, p...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 14,026 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 14,329 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 14,203 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 14,321 bytes +1,360 Created claim: summary (P836): The construction is located on the two-track national line No.250 Brno – Havlíčkův Brod in the section Řikonín – Vlkov u Tišnova. The line is electrified by alternating traction of 25 kV, the current line speed is 100 km/h. Níhov stop is located in the solved line section, which will also be the subject of reconstruction.Content of the construction is reconstruction of the railway substructure, superstructure, bridges, tunnels and technological...
  • curprev 21:1821:18, 23 October 2020DG Regio talk contribs 12,961 bytes −896 Removed claim: summary (P836): The construction site is located on the two track v250 of Brno — Havlíčkův Brod, in the road section of Regensburg — Vlkov, in the case of Tišnov. The line is electrified with an alternate of 25 kV lines, the current line speed is 100 km/h. in the track section at issue, the Nela stop that will also be the subject of the renovation works is the reconstruction of the track substructure, superstructure, bridges, tunnels and technology facilities...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 12,192 bytes +896 Created claim: summary (P836): The construction site is located on the two track v250 of Brno — Havlíčkův Brod, in the road section of Regensburg — Vlkov, in the case of Tišnov. The line is electrified with an alternate of 25 kV lines, the current line speed is 100 km/h. in the track section at issue, the Nela stop that will also be the subject of the renovation works is the reconstruction of the track substructure, superstructure, bridges, tunnels and technology facilities i...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020