Revision history of "Line speed increase in the section Kuřim – Tišnov" (Q72171)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:2311:23, 25 July 2022DG Regio talk contribs 45,748 bytes +25,904 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 15,068 bytes +1,318 Created claim: summary (P836): L’objectif de la construction est d’augmenter la vitesse de la ligne, d’améliorer le confort de conduite en réduisant les temps de conduite et de reconstruire la gare pour répondre aux besoins actuels et prospectifs des clients du transport de voyageurs, d’améliorer le confort des passagers en reconstruisant des plates-formes d’accès sans obstacle, de construire un système d’information et d’accroître la sécurité par de nouveaux équipements de s...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,750 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 14,067 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 13,953 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 14,070 bytes +1,222 Created claim: summary (P836): The aim of the construction is to increase line speed, improve travelling comfort with shorter journey times and reconstruction of the railway station for current and prospective requirements of passenger transport orderers, improvement of passenger comfort by reconstructing platforms for barrier-free access, building an information system and increasing safety with new station signalling equipment., translated_summary
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 12,848 bytes −768 Removed claim: summary (P836): The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 11,949 bytes +768 Created claim: summary (P836): The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020