Revision history of "Modernisation of the Karlovy Vary railway station" (Q72140)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

13 October 2024

  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 49,601 bytes +3 Changed label, description and/or aliases in pt
  • curprev 12:5312:53, 13 October 2024DG Regio talk contribs 49,598 bytes +14 Set a claim value: summary (P836): O objectivo do projecto é a reconstrução da estação ferroviária de Karlovy Vary (estação ferroviária superior). O edifício de passageiros existente em estado de emergência será substituído por um novo edifício com capacidade suficiente para o desalfandegamento de passageiros. Será assegurado o livre acesso dos passageiros às novas plataformas. Proceder-se-á à reconstrução da subestrutura e da superstrutura, à modificação da linha de contacto, ao equ...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

10 March 2023

9 March 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:1911:19, 25 July 2022DG Regio talk contribs 47,884 bytes +26,099 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

8 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5900:59, 29 November 2021DG Regio talk contribs 15,115 bytes +1,348 Created claim: summary (P836): L’objet du projet est la reconstruction de la gare de Karlovy Vary (gare supérieure). Le bâtiment de passagers existant en état d’urgence sera remplacé par un nouveau bâtiment doté d’une capacité suffisante pour traiter les passagers. L’accès sans obstacles des passagers aux nouvelles plates-formes sera assuré. La reconstruction de la sous-structure et de la superstructure ferroviaires, la modification de la ligne aérienne de contact, l’équipeme...
  • curprev 00:5900:59, 29 November 2021DG Regio talk contribs 13,767 bytes +99 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 14,117 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 14,007 bytes −91 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 14,098 bytes +1,286 Created claim: summary (P836): The object of the project is the reconstruction of the railway station Karlovy Vary (top railway station). The existing passenger building in a state of emergency will be replaced by a new building with sufficient capacity for passenger clearance. Barrier-free access for passengers to new platforms will be ensured. Reconstruction of the substructure and superstructure will be carried out, modifications to the contact line, signalling and communi...
  • curprev 21:1721:17, 23 October 2020DG Regio talk contribs 12,812 bytes −817 Removed claim: summary (P836): The project concerns the reconstruction of Karlovy Vary station station (the upper station). The current recovery building in the emergency situation will be replaced by a new construction with sufficient passenger capacity. Passengers will be given barrier-free access to new platforms. A reconstruction of the track substructure and superstructure, modification of the traction line, signalling and communication equipment will be carried out.,...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5919:59, 26 February 2020DG Regio talk contribs 11,957 bytes +817 Created claim: summary (P836): The project concerns the reconstruction of Karlovy Vary station station (the upper station). The current recovery building in the emergency situation will be replaced by a new construction with sufficient passenger capacity. Passengers will be given barrier-free access to new platforms. A reconstruction of the track substructure and superstructure, modification of the traction line, signalling and communication equipment will be carried out., Ad...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)