Revision history of "Equipment of MVTV rail vehicles 2.2-2.3 with ETCS_1 on-board units" (Q72068)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 11:0911:09, 25 July 2022DG Regio talk contribs 41,948 bytes +23,986 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 13,710 bytes +1,197 Created claim: summary (P836): Dans le cadre du projet, des unités ETCS embarquées seront installées dans des véhicules de traction spéciaux MVTV 2.2-2,3 destinés à l’entretien de la ligne aérienne de l’infrastructure ferroviaire. Les équipements équipés d’unités embarquées ETCS doivent permettre le fonctionnement des véhicules concernés sur les lignes avec l’interverrouillage ETCS., translated_summary
  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 12,513 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,819 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,694 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,809 bytes +1,105 Created claim: summary (P836): As part of the project, the ETCS onboard units will be installed in the special traction vehicles MVTV 2.2-2.3 designed for the maintenance of the railway infrastructure contact line. ETCS on-board units shall enable the vehicles concerned to be operated on lines with ETCS interlocks., translated_summary
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 11,704 bytes −662 Removed claim: summary (P836): As part of the project, the on-board ETCS on-board units will be installed in the special driving vehicles for MVTV 2.2-2.3 for the maintenance of the traction lines. The equipping of the on-board ETCS shall allow the operation of the concerned vehicles on the lines with the ETCS on-board., remove_old_english_translation

24 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 10,695 bytes +662 Created claim: summary (P836): As part of the project, the on-board ETCS on-board units will be installed in the special driving vehicles for MVTV 2.2-2.3 for the maintenance of the traction lines. The equipping of the on-board ETCS shall allow the operation of the concerned vehicles on the lines with the ETCS on-board., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020