Revision history of "Thermal insulation of Litultovice Kindergarten" (Q72057)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 03:0603:06, 13 October 2024DG Regio talk contribs 51,934 bytes 0 Changed label, description and/or aliases in pt
  • curprev 03:0603:06, 13 October 2024DG Regio talk contribs 51,934 bytes −6 Set a claim value: summary (P836): A reconstrução do Jardim de Infância Litultovice visa introduzir medidas abrangentes para reduzir o desempenho energético do edifício. O isolamento térmico do edifício do jardim de infância e a nova fachada pelo sistema ETICS serão concluídos, a substituição dos enchimentos de abertura será concluída, a extensão do telhado criará um espaço para isolamento do teto, modificação do aquecimento do edifício, instalação de 2 unidades de recuperação. Painé...

20 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 11:0711:07, 25 July 2022DG Regio talk contribs 49,269 bytes +28,461 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 14,602 bytes +1,487 Created claim: summary (P836): La reconstruction de la maternelle Litultovice vise à introduire des mesures globales pour améliorer la performance énergétique du bâtiment. L’enveloppe du bâtiment de la maternelle et de la nouvelle façade sera isolée par le système ETICS, le remplacement des trous de remplissage sera complété, la superstructure du toit mural créera un espace pour l’isolation du plafond, la modification du chauffage du bâtiment, l’installation de 2 unités de ré...
  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 13,115 bytes +107 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 13,457 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 13,352 bytes −94 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 13,446 bytes +1,446 Created claim: summary (P836): The reconstruction of Litultovice Kindergarten is aimed at introducing comprehensive measures to reduce the energy performance of the building. Thermal insulation of the building of the kindergarten and the new façade by ETICS system will be completed, the replacement of the opening fillings will be completed, the extension of the roof will create a space for insulation of the ceiling, modification of heating of the building, installation of 2 r...
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,000 bytes −977 Removed claim: summary (P836): The reconstruction of the parent nursery Litutovice is on track to implement comprehensive measures to reduce the energy performance of the building. The insulation of the envelope of the MŠ and of the new façade by the ETICS system will be completed, the replacement of the filling is completed, the superstructure of the upper roof will have to accommodate the insulation of the ceiling, the heating adjustment of the building, the installation...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 11,704 bytes +977 Created claim: summary (P836): The reconstruction of the parent nursery Litutovice is on track to implement comprehensive measures to reduce the energy performance of the building. The insulation of the envelope of the MŠ and of the new façade by the ETICS system will be completed, the replacement of the filling is completed, the superstructure of the upper roof will have to accommodate the insulation of the ceiling, the heating adjustment of the building, the installation of...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020