Revision history of "Trolleybus line Novolíšeňská – Jírova" (Q72032)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 11:0311:03, 25 July 2022DG Regio talk contribs 47,222 bytes +27,264 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 13,996 bytes +1,487 Created claim: summary (P836): L’objet du projet est la mise en œuvre de l’extension de la ligne de trolleybus 25 et 26 le long de la rue Novolíšeňská de la boucle d’extrémité existante des trolleybus jusqu’au terminal d’autobus existant Jírova. C’est 1 600 m de ligne aérienne de contact et 1 200 m de nouvelles voies de câbles. Une partie de la ligne de trolleybus est également la construction d’une nouvelle sous-station dans la station de tournage JIROV. En outre, des travau...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,509 bytes +107 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,855 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,750 bytes −101 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 12,851 bytes +1,358 Created claim: summary (P836): The object of the project is to extend the trolleybus line of lines 25 and 26 along Novolíšeňská Street from the existing end loop of trolleybuses to the existing bus terminal Jírova. It is a 1600 m overhead contact line and 1200 m new cable routes. Part of the trolleybus line is the construction of a new substation in the Jírov turnaround. In addition, construction modifications will take place on the standstill of the Jírova terminal and modif...
  • curprev 20:5820:58, 23 October 2020DG Regio talk contribs 11,493 bytes −870 Removed claim: summary (P836): The project involves the realisation of the extension of the trolley-bus line 25 and 26 from the existing terminal loop of the trolley-bus to the existing Jírova bus terminal. These are 1 600 m overhead contact line and 1 200 m new cable. The trolley-bus line includes the construction of a new converter station in Jírov. It will also make a building block on the surface area of the Jírova terminal and the adaptation of the take-off stops (dire...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:4919:49, 26 February 2020DG Regio talk contribs 11,073 bytes +870 Created claim: summary (P836): The project involves the realisation of the extension of the trolley-bus line 25 and 26 from the existing terminal loop of the trolley-bus to the existing Jírova bus terminal. These are 1 600 m overhead contact line and 1 200 m new cable. The trolley-bus line includes the construction of a new converter station in Jírov. It will also make a building block on the surface area of the Jírova terminal and the adaptation of the take-off stops (direct...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020