Revision history of "Realisation of energy savings – Frýdek barracks area – Místek – Temperated garages" (Q71999)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 03:0503:05, 13 October 2024DG Regio talk contribs 51,500 bytes +3 Changed label, description and/or aliases in pt
  • curprev 03:0503:05, 13 October 2024DG Regio talk contribs 51,497 bytes −3 Set a claim value: summary (P836): Trata-se do isolamento das garagens temperadas do edifício na zona do quartel Frýdek – Místek, Frýdlantská 2402, território cadastral Místek, parcela n.o 3584/10. É um isolamento de telhado e uma substituição dos obturadores de abertura. O objetivo do projeto é melhorar significativamente as características energéticas da envolvente do edifício, conduzindo a uma redução do desempenho energético do funcionamento do edifício em conformidade com as con...

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 10:5810:58, 25 July 2022DG Regio talk contribs 48,318 bytes +28,022 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 14,084 bytes +1,434 Created claim: summary (P836): C’est l’isolation du bâtiment des garages tempérés dans les locaux de la caserne Frýdek — Místek, Frýdlantská 2402, zone cadastrale de Místek, parcelle numéro 3584/10. Il s’agit de l’isolation du toit et du remplacement des trous de remplissage. L’objectif du projet est d’améliorer de manière significative la performance énergétique de l’enveloppe du bâtiment, ce qui entraînera une réduction de la performance énergétique de l’opération du bâtime...
  • curprev 00:5700:57, 29 November 2021DG Regio talk contribs 12,650 bytes +166 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5720:57, 23 October 2020DG Regio talk contribs 12,933 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5720:57, 23 October 2020DG Regio talk contribs 12,784 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5720:57, 23 October 2020DG Regio talk contribs 12,947 bytes +1,369 Created claim: summary (P836): This is the insulation of the building tempered garages in the area of the barracks Frýdek – Místek, Frýdlantská 2402, cadastral territory Místek, parcel number 3584/10. It is a roof insulation and a replacement of the opening fillings. The aim of the project is to significantly improve the energy characteristics of the building envelope leading to a reduction of the energy performance of the building operation in accordance with the conditions...
  • curprev 20:5720:57, 23 October 2020DG Regio talk contribs 11,578 bytes −879 Removed claim: summary (P836): This is the insulation of the buildings of the darknet, Frýdek — Místek, Frýdlantská 2402, cadastral district Místek, parcel No 3584/10. This is the insulation of the roof and the replacement of the opening of the hole. The project aims at significantly improving the energy performance of the building envelope leading to a reduction in the energy performance of the building in line with the conditions of the call of the OPE. No risks are expec...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 19:4919:49, 26 February 2020DG Regio talk contribs 11,178 bytes +879 Created claim: summary (P836): This is the insulation of the buildings of the darknet, Frýdek — Místek, Frýdlantská 2402, cadastral district Místek, parcel No 3584/10. This is the insulation of the roof and the replacement of the opening of the hole. The project aims at significantly improving the energy performance of the building envelope leading to a reduction in the energy performance of the building in line with the conditions of the call of the OPE. No risks are expecte...

18 February 2020

11 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020