Revision history of "Renewal and optimisation of system infrastructure for SF7+ in Centre II." (Q71432)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

20 March 2024

15 January 2024

22 December 2023

10 June 2023

17 February 2023

25 July 2022

  • curprev 09:2909:29, 25 July 2022DG Regio talk contribs 48,574 bytes +28,328 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:5200:52, 29 November 2021DG Regio talk contribs 14,070 bytes +1,467 Created claim: summary (P836): Le projet concerne des tableaux de disques — les réseaux de disques existants ne peuvent pas être entièrement optimisés parce qu’il n’y a pas de capacité suffisante et, en même temps, l’ensemble du système serait arrêté pendant plusieurs heures, commutateurs FC — il n’est pas possible de mettre à jour ou de mettre à niveau la vitesse de transfert, les pare-feu — type de fin de gamme, le fabricant ne supporte plus dans son intégralité. Le remplac...
  • curprev 00:5200:52, 29 November 2021DG Regio talk contribs 12,603 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 20:2620:26, 23 October 2020DG Regio talk contribs 12,903 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:2620:26, 23 October 2020DG Regio talk contribs 12,772 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:2620:26, 23 October 2020DG Regio talk contribs 12,907 bytes +1,348 Created claim: summary (P836): Within the project these are disk arrays – the existing disk arrays cannot be fully optimised because there is insufficient capacity and at the same time the whole system would be stopped for several hours, FC switches – it is not possible to update or increase the transfer rate, firewalls – the runway type, the manufacturer no longer supports the full range. Replacing these components will ensure the functionality and availability of the SF7+ i...
  • curprev 20:2620:26, 23 October 2020DG Regio talk contribs 11,559 bytes −864 Removed claim: summary (P836): The project is disk array — the current “disk array” can no longer be optimised because there is insufficient capacity and, at the same time, the whole system is stopped for several hours, FC swiche — it cannot be updated or upgraded to the transfer rate, the vehicle type is not fully supported by the manufacturer. The replacement of these components shall ensure the functionality and availability of SF7 + infrastructure for the following year...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)