Revision history of "Adjustments to the moisture regimes on land 136" (Q69833)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 02:1102:11, 13 October 2024DG Regio talk contribs 49,616 bytes −9 Set a claim value: summary (P836): O objetivo da construção Modificação dos regimes de umidade na parcela 136 é melhorar as condições de umidade e aumentar a biodiversidade da localidade. Espera-se criar duas piscinas com uma zona costeira, que será alimentada pelo aumento dos níveis de água subterrânea e um esgoto de chuva obscurecido. A regulação da água nas piscinas será possível através do veio de entrada, onde será instalado um elemento de controlo para eliminar possíveis piscin...

22 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 05:5005:50, 25 July 2022DG Regio talk contribs 46,435 bytes +26,550 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 00:4000:40, 29 November 2021DG Regio talk contribs 14,185 bytes +1,313 Created claim: summary (P836): L’objectif de la reconstruction des régimes d’humidité sur la placette 136 est d’améliorer les conditions d’humidité et la biodiversité du site. Il est envisagé de créer deux bassins avec une zone littorale, qui seront alimentées par un niveau élevé d’eau souterraine et un drainage pluvial. La régulation de l’eau dans les piscines sera possible à travers le puits d’entrée, où un élément de commande sera installé pour éliminer tout «flushing» des...
  • curprev 00:4000:40, 29 November 2021DG Regio talk contribs 12,872 bytes +116 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 19:5519:55, 23 October 2020DG Regio talk contribs 13,205 bytes +106 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:5519:55, 23 October 2020DG Regio talk contribs 13,099 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:5519:55, 23 October 2020DG Regio talk contribs 13,204 bytes +1,273 Created claim: summary (P836): The purpose of the construction Modification of moisture regimes on plot 136 is to improve the moisture conditions and enhance the biodiversity of the locality. It is expected to create two pools with a litoral zone, which will be powered by increased groundwater levels and an obscured rain sewer. Water regulation in pools will be possible through the inflow shaft, where a control element for eliminating possible “flush” pools will be installed....
  • curprev 19:5519:55, 23 October 2020DG Regio talk contribs 11,931 bytes −803 Removed claim: summary (P836): The purpose of the adjustment of the special arrangements on plot 136 is to improve moisture and to strengthen the biodiversity of the site. It is expected to create two twells with a littoral zone to be fed by elevated ground water levels and sweeping storm water drainage. It will be possible to regulate the water in the dark through a hub, where a regulatory element for the elimination of potential ‘purge’ will be fitted., remove_old_english...

24 September 2020

23 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 20:1020:10, 26 February 2020DG Regio talk contribs 11,449 bytes +803 Created claim: summary (P836): The purpose of the adjustment of the special arrangements on plot 136 is to improve moisture and to strengthen the biodiversity of the site. It is expected to create two twells with a littoral zone to be fed by elevated ground water levels and sweeping storm water drainage. It will be possible to regulate the water in the dark through a hub, where a regulatory element for the elimination of potential ‘purge’ will be fitted., Adding English summary

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020