Revision history of "Revitalisation Private" (Q69509)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 01:3401:34, 13 October 2024DG Regio talk contribs 49,665 bytes −1 Changed label, description and/or aliases in pt
  • curprev 01:3401:34, 13 October 2024DG Regio talk contribs 49,666 bytes −5 Set a claim value: summary (P836): Revitalização A revitalização autopropulsionada na zona de nascente do fluxo de água sem nome, na parte norte do desenvolvimento do Souper. O aquecedor de água é actualmente em grande parte chifres. O objetivo desta revitalização é restaurar a função natural do curso de água e do rio adjacente. A medida otimiza a situação hidrológica na bacia de Zdobnice, aumenta os valores ecológicos do território através da criação de novos habitats para promover...

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 05:0305:03, 25 July 2022DG Regio talk contribs 46,489 bytes +26,961 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:3800:38, 29 November 2021DG Regio talk contribs 13,744 bytes +1,373 Created claim: summary (P836): Sa propre revitalisation résout la revitalisation dans la zone d’origine du cours d’eau sans nom, dans la partie nord du bâtiment de Sou Own. À l’heure actuelle, le cours d’eau est principalement en tube. L’objectif de cette revitalisation est de restaurer la fonction naturelle du cours d’eau et du niveau adjacent. La mesure optimise la situation hydrologique dans le bassin de Zdobnice, augmente les valeurs écologiques de la zone en créant de no...
  • curprev 00:3800:38, 29 November 2021DG Regio talk contribs 12,371 bytes +80 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 19:3319:33, 23 October 2020DG Regio talk contribs 12,740 bytes +81 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:3319:33, 23 October 2020DG Regio talk contribs 12,659 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:3319:33, 23 October 2020DG Regio talk contribs 12,749 bytes +1,330 Created claim: summary (P836): Revitalisation The self-propelled revitalisation in the spring area of the nameless water flow, in the part north of the development of the Souper. The water heater is currently largely horned. The aim of this revitalisation is to restore the natural function of the watercourse and the adjacent river. The measure optimises the hydrological situation in the Zdobnice basin, increases the ecological values of the territory by creating new habitats...
  • curprev 19:3319:33, 23 October 2020DG Regio talk contribs 11,419 bytes −910 Removed claim: summary (P836): The revitalisation of the associate addresses the revitalisation of the spring no-request water area in a part north of the built environment. The Voter is currently largely incorporated into the tube. The aim of this revitalisation is to restore the natural function of a watercourse and adjacent nip. The measure will optimise the hydrogeological situation in the drainage basin, increase the ecological values of the territory by creating new b...

24 September 2020

23 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:4619:46, 26 February 2020DG Regio talk contribs 11,044 bytes +910 Created claim: summary (P836): The revitalisation of the associate addresses the revitalisation of the spring no-request water area in a part north of the built environment. The Voter is currently largely incorporated into the tube. The aim of this revitalisation is to restore the natural function of a watercourse and adjacent nip. The measure will optimise the hydrogeological situation in the drainage basin, increase the ecological values of the territory by creating new bio...

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020