Revision history of "Sazava, i.e. km 17,904 – Reconstruction of weir Podělusy" (Q69417)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 04:5004:50, 25 July 2022DG Regio talk contribs 42,867 bytes +23,817 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:3900:39, 29 November 2021DG Regio talk contribs 14,751 bytes +1,205 Created claim: summary (P836): L’objectif du projet est d’éliminer la barrière de migration pour les animaux aquatiques en construisant une transition technique des poissons. La construction de la traversée de poissons fait partie d’une mesure globale, qui comprend la reconstruction du déversoir, la construction d’un passage à poissons et la construction d’un laissez-passer sportif pour les marins., translated_summary
  • curprev 00:3900:39, 29 November 2021DG Regio talk contribs 13,546 bytes +121 Changed label, description and/or aliases in fr: translated_label

29 October 2020

24 October 2020

  • curprev 09:1709:17, 24 October 2020DG Regio talk contribs 13,870 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1709:17, 24 October 2020DG Regio talk contribs 13,752 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:1709:17, 24 October 2020DG Regio talk contribs 13,861 bytes +1,149 Created claim: summary (P836): The aim of the project is to remove migration barriers for aquatic animals by building a technical crevice fish crossing. The construction of the fish crossing is part of a complex measure, which includes the reconstruction of the weir body, the construction of a fish crossing and the construction of a sports pass for watermen., translated_summary
  • curprev 09:1709:17, 24 October 2020DG Regio talk contribs 12,712 bytes −699 Removed claim: summary (P836): The aim of the project is to remove the migration barrier for aquatic animals by building a technical crevice of fish transition. The building of the fish transition is part of a comprehensive measure that includes the reconstruction of the rider, the creation of a fish transfer and the building of a sport hit for watersheds., remove_old_english_translation

24 September 2020

23 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:4519:45, 26 February 2020DG Regio talk contribs 11,743 bytes +699 Created claim: summary (P836): The aim of the project is to remove the migration barrier for aquatic animals by building a technical crevice of fish transition. The building of the fish transition is part of a comprehensive measure that includes the reconstruction of the rider, the creation of a fish transfer and the building of a sport hit for watersheds., Adding English summary

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020