Revision history of "FISH CROSSOVER" (Q68502)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:1721:17, 12 October 2024DG Regio talk contribs 51,591 bytes +4 Changed label, description and/or aliases in pt
  • curprev 21:1721:17, 12 October 2024DG Regio talk contribs 51,587 bytes +7 Set a claim value: summary (P836): O projecto diz respeito à construção de uma passagem de fendas para peixes e de um ralo de gravilha no açude existente e à modificação das jazidas subterrâneas no km 76.456 no rio Jizera, território cadastral de Přepeře u Turnova. A construção situar-se-á na fossa do curso de água p. 326/1, p. 326/12, no açude 501 e interferirá parcialmente na parcela n.o 292/3. Parte da travessia de peixe será uma cortina elétrica para garantir a introdução de peix...

12 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 02:3902:39, 25 July 2022DG Regio talk contribs 47,876 bytes +27,801 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:3000:30, 29 November 2021DG Regio talk contribs 13,992 bytes +1,485 Created claim: summary (P836): Le projet porte sur la construction d’une traversée de poissons et de passages en gravier sur le déversoir existant et sur le traitement des wagons au km 76.456 sur la rivière Jizera, la zone cadastrale de Přepeře u Turnova. La construction sera située dans le cours d’eau no 326/1, p. 326/12, sur le déversoir 501 et interférera partiellement avec la placette 292/3. La transition des poissons comprendra un écran électrique pour s’assurer que les...
  • curprev 00:3000:30, 29 November 2021DG Regio talk contribs 12,507 bytes +81 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:0420:04, 23 October 2020DG Regio talk contribs 12,875 bytes +73 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:0420:04, 23 October 2020DG Regio talk contribs 12,802 bytes −79 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:0420:04, 23 October 2020DG Regio talk contribs 12,881 bytes +1,409 Created claim: summary (P836): The project deals with the construction of a crevice fish crossing and gravel culvert on the existing weir and modification of the underjews in km 76,456 on the river Jizera, cadastral territory Přepeře u Turnova. The construction will be located in the trough of the watercourse p. no. 326/1, p. no. 326/12, on weir 501 and will partially interfere on plot No 292/3. Part of the fish crossing will be an electric curtain to ensure the introduction...
  • curprev 20:0420:04, 23 October 2020DG Regio talk contribs 11,472 bytes −950 Removed claim: summary (P836): The project deals with the construction of a slit and gravel spill over the current jewelry and adjustment at km 76,456 on the river Jizera, the cadastral district of the Turnov movement. The construction work will be situated in the body of the watercourse, No 326/1, No 326/12, at the date of Protocol No 501, and in part will be covered by parcel No 292/3. Part of the fish migration shall include an electrical orifice for guiding the fish to...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:2719:27, 26 February 2020DG Regio talk contribs 11,147 bytes +950 Created claim: summary (P836): The project deals with the construction of a slit and gravel spill over the current jewelry and adjustment at km 76,456 on the river Jizera, the cadastral district of the Turnov movement. The construction work will be situated in the body of the watercourse, No 326/1, No 326/12, at the date of Protocol No 501, and in part will be covered by parcel No 292/3. Part of the fish migration shall include an electrical orifice for guiding the fish to th...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020