Revision history of "Rveitisation of floodplain forest Tvrdonice III. stage" (Q68483)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 02:3702:37, 25 July 2022DG Regio talk contribs 48,179 bytes +27,951 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

29 November 2021

  • curprev 00:2900:29, 29 November 2021DG Regio talk contribs 14,065 bytes +1,478 Created claim: summary (P836): Le projet résout l’achèvement du système de revitalisation des canaux d’eau dans le complexe forestier de la plaine inondable de Tvrdonice, EVL Soutok-Podluží. L’objectif du projet est de nettoyer certaines sections de canal, de construire des installations de manutention — arrêts et ponceaux pour la rétention d’eau, de créer des zones humides et des piscines à trois endroits dans cette région. L’objectif de cette mesure est d’améliorer le régim...
  • curprev 00:2900:29, 29 November 2021DG Regio talk contribs 12,587 bytes +126 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:0320:03, 23 October 2020DG Regio talk contribs 12,910 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:0320:03, 23 October 2020DG Regio talk contribs 12,797 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:0320:03, 23 October 2020DG Regio talk contribs 12,912 bytes +1,365 Created claim: summary (P836): The project solves the completion of the revitalisation system of water canals in the floodplain complex Tvrdonice, EVL Soutok-Poluží. The aim of the project is to cleanse selected sections of canals, building manipulation objects – construction and culverts for water retention, creating wetlands and pools on three locations in this area. The aim of the measure is to improve the water regime in the vast area of floodplain forests (Natura 2000 bi...
  • curprev 20:0320:03, 23 October 2020DG Regio talk contribs 11,547 bytes −914 Removed claim: summary (P836): The project deals with completion of regeneration of aquatic channels in the alluvial forest complex by Tvrdonice, EVL Soutok-Podluí. The project aims to clean up selected sections of the channels, to develop manipulative objects — water storage and laissez passer, to create wetlands and tutorials on three sites in this territory. The purpose of the measure is to improve the water regime in the large area of alluvial forests (Natura 2000 bioto...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:2719:27, 26 February 2020DG Regio talk contribs 11,170 bytes +914 Created claim: summary (P836): The project deals with completion of regeneration of aquatic channels in the alluvial forest complex by Tvrdonice, EVL Soutok-Podluí. The project aims to clean up selected sections of the channels, to develop manipulative objects — water storage and laissez passer, to create wetlands and tutorials on three sites in this territory. The purpose of the measure is to improve the water regime in the large area of alluvial forests (Natura 2000 biotope...

17 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020